W51AA1-26-R-0012 Exhibit 6 - Questions and Answers WORKING.docx | DOCX | Jun 11, 2026 | |
W51AA1-26-Q-A068 Exhibit 6 - Questions and Answers.pdf | Jun 11, 2026 | ||
W51AA1-26-Q-A068 Exhibit 4 - QASP.pdf | Jun 11, 2026 | ||
W51AA1-26-Q-A068 Exhibit 5 - DBA WD.pdf | Jun 11, 2026 | ||
W51AA1-26-Q-A068 Exhibit 2 - Drawings.pdf | Jun 11, 2026 | ||
W51AA1-26-Q-A068 Exhibit 3B - Standard Design Criteria for School Age Centers.pdf | Jun 11, 2026 | ||
W51AA1-26-Q-A068 Exhibit 3A - Standard Design Criteria for School Age Centers.pdf | Jun 11, 2026 | ||
W51AA1-26-Q-A068 Exhibit 1 - Specifications.pdf | Jun 11, 2026 | ||
Solicitation W51AA1-26-Q-A068.pdf | Jun 11, 2026 |
Playground Upgrades for Child Development Center at TYAD
Contact and place of performance
Mark Buonomo
Tobyhanna, PA 18466
USA
Project Description: This requirement is for the construction services required to complete playground upgrades for the CDC at Tobyhanna Army Depot (TYAD). Specific work includes supply and installation of a new climbing structure for ages 0-5 (including site preparation, layout verification, equipment assembly, and secure anchoring of the structure) and the expanding of existing swing set fall zones for...
View moreSite Visit Information: One scheduled (1) site visit will be held on Wednesday, 17 June, at 1:00 PM EST. Attendees are encouraged to arrive 15 minutes early to ensure timely processing. Visitors may be required to present a valid Government issued photo I.D.(REAL ID is required) to gain access to the base (vehicle registration and insurance may also be required). Information provided at each site visit, as well as answers to any general questions, shall not affect the terms and conditions of the RFP and/or specifications. Terms remain unchanged unless the RFP is amended in writing. RSVP is requested NLT Wednesday, 17 June, at 10:00 AM EST. RSVP via e-mail only to the Contracting Officer at [email protected].
Questions and Answers: All questions must be submitted in writing to the Contracting Officer, Mark Buonomo, via e-mail only, at [email protected]. Offerors are instructed NOT to contact any other Government personnel, as this may result in delay of answers. Questions must be received no later Wednesday, 18 June, at 2:00PM EST (questions may not be considered after this date). All questions and answers will be provided as an updated Exhibit 6, on a non-attribution basis, and will be incorporated into any resultant contract.
Commencement, Prosecution, and Completion of Work (FAR Clause 52.211-10)
The Contractor shall be required to (a) commence work under this contract within 10 days after the date the Contractor receives the notice to proceed (NTP) (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than90 days after receipt of the NTP. The time stated for completion shall include final cleanup of the premises.
See Solicitation and attachments for full breakdown of requirement, including submission instructions, evaluation criteria, and basis of award.
The Department of the Army, specifically the Tobyhanna Army Depot (TYAD), is soliciting construction services for playground upgrades at its Child Development Center (CDC) in Tobyhanna, Pennsylvania. This project, identified under solicitation number W51AA1-26-Q-A068, involves the supply and installation of a new climbing structure for children aged 0–5, including site preparation, layout verification, equipment assembly, and secure anchoring. Additionally, the contractor will expand existing swing set fall zones for children aged 6–10. The selected provider is responsible for all licenses, permits, labor, materials, equipment, and supervision. The estimated magnitude of construction for this project is between $75,000.00 and $150,000.00.
This solicitation is categorized under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1PA for Construction of Recreation Facilities (Non-Building). It is designated as an SBA set-aside. Proposals are due by July 2, 2026. The contract requires work to commence within 10 days of receiving the notice to proceed (NTP) and stipulates that all work, including final cleanup, must be completed within 90 days of the NTP. The awardee will be required to provide alternative payment protection, such as a payment bond or an irrevocable letter of credit, within 10 days of the award.
The procurement includes nine attachments, such as drawings, standard design criteria for school-age centers, and a Davis-Bacon Act wage determination. A site visit is scheduled for June 17, 2026, at 1:00 PM EST, requiring an RSVP by 10:00 AM EST on the same day. Written questions regarding the solicitation must be submitted by June 18, 2026, and will be addressed in a formal exhibit. The primary point of contact for this requirement is Mark Buonomo.