Name | Type | Posted | Actions |
|---|---|---|---|
B09_AMEND-2-Attch1_SOW_UPDATED-BLNWR_Electrcial-Roof_Replcmt_260604_9pp_0002.pdf | Jun 4, 2026 | ||
B09_AMEND-2-Attch3_BidSchedule_1p-UPDATED_0002.docx | DOCX | Jun 4, 2026 | |
Sol_140FGA26Q0031_Amd_0002.pdf | Jun 4, 2026 | ||
B09_AMEND-1-140FGA26Q0031_UPDATED_TermsConditions_29pp_0001.pdf | Jun 1, 2026 | ||
Sol_140FGA26Q0031_Amd_0001.pdf | Jun 1, 2026 | ||
Attch2_B03_WD_DBA-NM20260014_ChavezCo-260518_4pp.pdf | May 27, 2026 | ||
Sol_140FGA26Q0031.pdf | May 27, 2026 | ||
Attch1_SOW_260527_9pp.pdf | May 27, 2026 | ||
B08_140FGA26Q0031_TermsConditions_29pp.pdf | May 27, 2026 | ||
Attch3_BidSchedule_1p.docx | DOCX | May 27, 2026 | |
Attch4_Questionnaire_2pp-fillable.pdf | May 27, 2026 |
Z--NM BITTER LAKE NWR ELECTRIC & ROOF
The US Fish and Wildlife Service is seeking firm-fixed-price bids for electrical system upgrades and roof replacement at the Bitter Lake National Wildlife Refuge Biology Compound. The project involves infrastructure improvements to a historic 1937 adobe building constructed by the Civilian Conservation Corps. Work includes rebuilding a 200-amp electrical service and replacing approximately 2,863 square feet of built-up roofing with a fleece-back membrane system. Technical specifications were updated through Amendment 0002 to require a 2-phase electrical system instead of the original 3-phase system. This is an emergency requirement with a performance period ending July 31, 2026, to address water intrusion and electrical corrosion. The solicitation is a total small business set-aside under NAICS 236220. Proposals are due June 15, 2026, and require three volumes: price, relevant experience, and technical approach. The U.S. Fish and Wildlife Service has issued solicitation 140FGA26Q0031 for electrical upgrades and roof replacement at the Bitter Lake National Wildlife Refuge. The work targets the Biology Building, a historic adobe structure built in 1937. This is a firm-fixed-price construction contract with an emergency performance window scheduled for July 2026 to stop ongoing water damage and electrical issues. The contractor will provide labor, materials, and supervision for electrical upgrades and roof replacement at the Bitter Lake National Wildlife Refuge Biology Compound in Roswell, New Mexico.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Johnson, Nicole
Not specified