Name | Type | Posted | Actions |
|---|---|---|---|
Photos above Drop Ceiling RFI Answer 08.pdf | Jun 10, 2026 | ||
Bldg 5703 Positives Findings.pdf | Jun 9, 2026 | ||
20045004.pdf | Jun 9, 2026 | ||
Bowling roof and envelope B5703 existing ref binder.pdf | Jun 9, 2026 | ||
05703_RoofSections.pdf | Jun 9, 2026 | ||
20Nov2025 Bowling roof and envelope B5703 Notes Calcs.pdf | Jun 9, 2026 | ||
05703A-FP01 occupancy-Layout1.pdf | Jun 9, 2026 | ||
Solicitation Amendment - FA813726R00290001.pdf | Jun 8, 2026 | ||
250173_Pre Bid RFI_response COR Signed.pdf | Jun 8, 2026 | ||
WWYK250173_Site_Visit_Signin.pdf | May 20, 2026 | ||
Solicitation - FA813726R0029.pdf | May 5, 2026 | ||
WWYK250173_EAL List.xlsx | XLSX | May 5, 2026 | |
ATT12_250713_Submittal Register r1.pdf | May 5, 2026 | ||
ATT13_250173_Drawings.pdf | May 5, 2026 | ||
Wage_Determination.txt | TXT | May 5, 2026 | |
ATT10_250173_SOW.pdf | May 5, 2026 |
TINKER AFB MAC BOA WWYK250173, Replace Bowling Alley Roof, B5703
The Air Force Sustainment Center at Tinker Air Force Base is soliciting proposals for a design-build project to repair and replace the roof and building envelope of Building 5703, the base bowling alley. This firm-fixed-price effort is restricted to Small Business Multiple Award Construction (MAC) Basic Ordering Agreement (BOA) holders who attended the mandatory site visit on May 20, 2026. The scope includes comprehensive engineering services, site investigations, and construction across civil, architectural, structural, mechanical, and electrical disciplines. The project is valued between $1,000,000 and $5,000,000 with a 447-calendar-day performance period. Technical requirements specify a 90 mil EPDM membrane and a 30-year No Dollar Limit (NDL) warranty. Environmental reports indicate the presence of asbestos-containing materials and lead-based paint, requiring specialized abatement. Proposals are due by June 15, 2026, following an extension issued via solicitation amendment. The project modernizes Building 5703 by addressing leaks, drainage failures, and code compliance through a design-build approach. Multi-disciplinary execution covering civil, architectural, structural, mechanical, plumbing, and electrical work.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Mario Tedeschi
S Coffeyville, OK 73145
USA
Update 03: June 10, 2026 Photos have been attached in relation to the Environmental study and positive findings Update 02: June 09, 2026 Attached file for Building 5703 Positive findings and Environmental report Update 01: June 09, 2026 As-Built Drawings and Info Attached below in relation to Pre Bid RFI Answers Updated: June 08, 2026 Solicitation Amended on June 08, 2026 to extend the offer due date from June 08, 20...
View moreThis posting is for Tinker AFB - MAC BOA Holders ONLY.
Project Solicitation Number: FA813726R0029
Project Title: WWYK250173, Replace Bowling Alley Roof, B5703
Project Location: Tinker AFB - B5703
Replace roof for B5703 at Tinker Air Force Base (AFB) Oklahoma 73145
The estimated project value is below $25M and is restricted to SB MAC BOA holders only.
Project specific documents are attached to this posting.
If you experience any difficulty at receiving or access to the project specific documents, send an email request to Contracting Points of Contact listed to have a DoD Safe document transmission. In the email, please provide email addresses for Prime Contractor ONLY points of contact to have the DoD Safe link sent to. Do not include any Sub-Contractor email addresses.
Currently, the Solicitation – Request for Proposal (RFP) is in the draft stage and will be posted once available.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 3 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ***** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.
Initial Site Visit is set for May 20th, 2026, 2:00 PM, At Building 5703 south side parking lot.
*Only 7 attendees per Prime Contractor allowed to attend Site Visit.*
You must attend the Initial Site Visit for the project to be considered eligible to propose.
Funds are not presently available for this contract. The Governments obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer
This posting is for Tinker AFB - MAC BOA Holders ONLY.