Name | Type | Posted | Actions |
|---|---|---|---|
W912PB21Q3063 Revised.pdf | Sep 16, 2021 | ||
Amendment 0001_W912PB21Q3063.pdf | Sep 16, 2021 | ||
Amendment 0002_W912PB21Q3063.pdf | Sep 16, 2021 | ||
Amendment 0003_W912PB21Q3063.pdf | Sep 16, 2021 | ||
PWS_Electrical Equipment_W912PB21Q3063_Revised.pdf | Sep 16, 2021 | ||
ELIN-Schedule_ElectricalEquipment_W912PB21Q3063.xlsx | XLSX | Sep 16, 2021 |
Recurring Electrical Safety Inspections, Calibration and Repairs of Electrical Equipment at USAG BAVARIA - Hohenfels
Contact and place of performance
Christian Richter
DEU
Amendment 0003 The purpose of this amendment is to: 1. Re-open the solicitation and to extend the required response date/time from 22 September 2021 10:00 AM to 7 October 2021 10:00 AM CET. 2. Change the performance period from 15-SEP-2021 through 14-SEP-2024 to 01-JAN-2022 through 31-DEC-2024. 3. Add Factor 3 Subcontracting to the clause 52.212-2, as reads below. Factor 3: Subcontracting SUBCONTRACTING: As required...
View moreThe United States Army Corps of Engineers is soliciting non-personal services for recurring electrical safety inspections, calibration, and repairs of electrical equipment categories A, B, and C at USAG Bavaria-Hohenfels in Germany. The contractor is responsible for the planning, programming, administration, management, and execution of all functions required to deliver these services. All work must comply with applicable United States, German, and local laws, regulations, and standards as specified in the Performance Work Statement.
This solicitation, identified by number W912PB21Q3063, is classified under NAICS code 811219 and PSC H359 for inspection of electrical and electronic equipment components. The performance period is scheduled from January 1, 2022, through December 31, 2024. Christian Richter is the designated point of contact for this requirement, which is located in Germany.
Responses are due by October 7, 2021, at 10:00 AM CET. Submissions must include subcontracting information, requiring either a statement that all work will be performed exclusively by the offeror or a list of proposed subcontractors and business partners accompanied by letters of intent. The solicitation documentation includes six attachments: a revised solicitation, three amendments, a revised Performance Work Statement dated September 16, 2021, and an ELIN schedule.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.