Name | Type | Posted | Actions |
|---|---|---|---|
Amendment 02.pdf | May 7, 2026 | ||
Amendment 01.pdf | Apr 24, 2026 | ||
Attachment 1 - Solicitation Black Jack Campground Renovations.pdf | Apr 15, 2026 | ||
Attachment 4 - Project Specifications Black Jack CG.pdf | Apr 15, 2026 | ||
Attachment 6 - Gate Design Black Jack CG.pdf | Apr 15, 2026 | ||
Attachment 2 - SOI Black Jack Campground Renovation.xlsx | XLSX | Apr 15, 2026 | |
Attachment 8 - DBA WD AZ20260031 010226.pdf | Apr 15, 2026 | ||
Attachment 5 - Drawings Black Jack CG.pdf | Apr 15, 2026 | ||
Attachment 7 - Septic System Design Black Jack CG.pdf | Apr 15, 2026 | ||
Attachment 3 - SOW and Map Black Jack CG revised.pdf | Apr 15, 2026 |
GAOA Black Jack Campground Renovation, Apache-Sitgreaves National Forest
Contact and place of performance
Judith Martin
Duncan, AZ
USA
This is a combined synopsis/solicitation for commercial construction prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation will not be issued. Solicitation number 127EAX26Q0023 is issued as a Request for Quotation (RFQ) for the Black Jack Campground Renovations on the Apache-Sitgreaves National...
View moreAmendment 02 posted 05/07/26 - Site Visit information and Questions/Answers
The United States Forest Service is issuing this combined synopsis/solicitation, 127EAX26Q0023, as a request for quotation for the renovation of the Black Jack Campground within the Apache-Sitgreaves National Forest. The project involves comprehensive site improvements including the removal of existing features such as signs, trees, campfire rings, and grills. New construction requirements encompass roads, low-water crossings, parking areas, drainage channels, camping spurs, tent pads, trails, and sidewalks. Additional installations include an overlook slab with railing, toilets, gates, firepits, and a ramada.
This acquisition is designated as a total small business set-aside under the SBA (Small Business Administration) program. The project is classified under NAICS 237990, Other Heavy and Civil Engineering Construction, and PSC Y1PA for the construction of recreation facilities (non-building). The primary place of performance is located in Duncan, Arizona.
Quotations are due by May 13, 2026, with Judith Martin serving as the point of contact. The solicitation package includes ten attachments, such as project specifications, gate designs, a schedule of items, and two amendments providing site visit information and responses to vendor questions. This procurement follows FAR Part 12 procedures for commercial construction.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.