No attachments available.
VALVE,REGULATIN, 2770073-114
Contact and place of performance
JEREMY P. BARNEY, N722.10, EMAIL [email protected]
Not specified
NOTE: NO FAST PAY. THE CONTRACTOR IS REQUIRED TO SHIP BY TRACEABLE MEANS. SEND A NOTIFICATION OF SHIPMENT TO BOTH THE PCO AND NAVSUP WSS REPAIR MANAGER: BALDEMAR CANTU,[email protected], GOVERNMENT SOURCE INSPECTION IS REQUIRED. CONTACT DCMC TRANSPORTATION OFFICER FOR SHIPPING INSTRUCTIONS. PACKAGING AND MARKING SHALL BE IN ACCORDANCE WITH BEST STANDARD COMMERCIAL PACKAGING FOR OVERSEAS SHIPMENT. I...
View moreTHROUGHPUT CONSTRAINT: TOTAL ASSETS TO BE REPAIRED MONTHLY AFTER INITIAL DELIVERY COMMENCES. A THROUGHPUT OF 0000/MONTH REFLECTS NO THROUGHPUT CONSTRAINT.
INDUCTION EXPIRATION DATE: ANY ASSET RECEIVED AFTER THIS DATE IN DAYS IS NOT AUTHORIZED TO BE REPAIRED WITHOUT BI-LATERAL AGREEMENT BETWEEN THE VENDOR AND CONTRACTING OFFICER.
THE CONTRACTOR MUST OBTAIN FINAL INSPECTION AND ACCEPTANCE BY THE GOVERNMENT FOR ALL ASSETS WITHIN THE RTATS ESTABLISHED IN THIS CONTRACT. ANY UNITS THAT MEET THE RTAT REQUIREMENT WITHIN THE SUBCLIN REMARKS SHALL BE PRICED AT THE UNIT PRICE ESTABLISHED IN THIS CONTRACT.
THROUGHPUT CONSTRAINT: TOTAL ASSETS TO BE REPAIRED MONTHLY AFTER INITIAL DELIVERY COMMENCES. A THROUGHPUT OF 0000/MONTH REFLECTS NO THROUGH PUT CONSTRAINT.
INDUCTION EXPIRATION DATE: ANY ASSET RECEIVED AFTER THIS DATE IN DAYS IS NOT AUTHORIZED TO BE REPAIRED WITHOUT BI-LATERAL AGREEMENT BETWEEN THE VENDOR AND CONTRACTING OFFICER.
THE CONTRACTOR MUST OBTAIN FINAL INSPECTION AND ACCEPTANCE BY THE GOVERNMENT FOR ALL ASSETS WITHIN THE RTATS ESTABLISHED IN THIS CONTRACT. ANY UNITS THAT MEET THE RTAT REQUIREMENT WITHIN THE SUBCLIN REMARKS SHALL BE PRICED AT THE UNIT PRICE ESTABLISHED IN THIS CONTRACT.
PRICE REDUCTIONS
ANY ASSETS FOR WHICH THE CONTRACTOR DOES NOT MEET THE REQUIRED RTAT WILL INCUR A PRICE REDUCTION OF TBD PER UNIT. THIS ADJUSTMENT WILL BE IMPLEMENTED VIA A RECONCILIATION MODIFICATION AT THE END OF CONTRACT PERFORMANCE. PRICE REDUCTIONS MADE PURSUANT TO THIS SECTION SHALL NOT LIMIT OTHER REMEDIES AVAILABLE TO THE GOVERNMENT FOR FAILURE TO MEET REQUIRED RTATS, INCLUDING BUT NOT LIMITED TO THE GOVERNMENT’S RIGHT TO TERMINATE FOR DEFAULT.
RECONCILIATION
A RECONCILIATION MODIFICATION WILL BE ISSUED AFTER FINAL INSPECTION AND ACCEPTANCE OF ALL ASSETS INDUCTED UNDER THIS CONTRACT. THE PARTIES HAVE AGREED TO A PRICE (SHOWN ON THE SCHEDULE PAGE) FOR EACH UNIT AT THE NEGOTIATED RTAT. SUCH PRICES ARE BASED ON THE CONTRACTOR MEETING THE RTAT REQUIREMENTS DESCRIBED WITHIN THE SCHEDULE PAGE. IF THE CONTRACTOR DOES NOT MEET THE APPLICABLE RTAT REQUIREMENT, THE PRICE ADJUSTMENT AS STATED SHALL BE APPLICABLE.
NAVSUP Weapon Systems Support, a division of the Department of the Navy, has issued pre-solicitation notice N0038326QH078 for the repair of regulating valves identified by part number 2770073-114. This requirement is classified under NAICS 332919 Other Metal Valve and Pipe Fitting Manufacturing and PSC 4810 VALVES, POWERED. There is no set-aside (NONE) associated with this solicitation. Responses are due by June 24, 2026, and the primary point of contact is Jeremy P. Barney.
The contractor is responsible for managing repairs within established Repair Turnaround Times (RTAT), measured from the physical receipt of an asset to the date of government acceptance. Performance involves reporting all transactions through the Commercial Asset Visibility (CAV) system within five business days of receipt. If an item is determined to be beyond economical repair or beyond repair, the contractor must notify the Defense Contract Management Agency Quality Assurance Representative for verification; scrapping or cannibalizing assets is prohibited without written authorization from the Procurement Contracting Officer. Government source inspection is required, and all items must be shipped by traceable means using best standard commercial packaging for overseas shipment.
Contractual terms include specific throughput constraints and an induction expiration date, after which assets cannot be repaired without a bilateral agreement. Final inspection and acceptance by the government are required for all assets within the specified RTAT. Failure to meet these delivery requirements will result in a price reduction per unit, which will be implemented via a reconciliation modification at the conclusion of contract performance. This reconciliation will adjust the negotiated unit prices based on whether the contractor fulfilled the RTAT requirements for all assets inducted under the contract.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.