165 AW Fiber Optic Infrastructure Edge Switches — Project XDQU-2023-00004
Contact and place of performance
Isao Hattori
USA
Authority and Timing: This notice is prepared in accordance with RFO FAR Subpart 5.1 and RFO FAR 12.201-1(c)(2) . The anticipated direct solicitation issue date is June 16, 2026 , satisfying the mandatory 15-day advance synopsis interval. General Scope & Function: The USPFO for Massachusetts requires a comprehensive procurement package of commercial infrastructure components, physical fiber routing assets, microd...
View moreDirect Solicitation Methodology: In accordance with RFO FAR 12.201-1(c)(2), the Contracting Officer is electing to solicit quotes directly from a minimum of three qualified small business sources. This public notice satisfies the statutory mandate to publish a GPE synopsis before issuing the direct RFQ packages to those selected sources.
Award Procedures & Legal Nature of Quotes:
Basis for Award: The contract will be awarded strictly to the responsible, solicited offeror who submits the Lowest Total Price meeting all structural and technical material specifications outlined in the Purchase Description. No technical or trade-off evaluation subfactors will be utilized.
Legal Effect: Pursuant to RFO FAR 12.201-1(b), any quotation submitted in response to the upcoming direct RFQ is not a binding contract. The subsequent purchase order issued by the Government will constitute the official offer, which becomes legally binding only when accepted by the supplier via written acknowledgment or substantial performance.
The anticipated contract award date is on or about July 10, 2026.
Delivery and Logistics Information
The final delivery location for all ordered assets under the resulting contract will be freight-on-board (FOB) destination to:
Shipping Address:
165 AW / 130 EIS
1401 Robert B. Miller Jr. Dr.
Savannah, GA 31408
The United States Property and Fiscal Office (USPFO) for Massachusetts is initiating a procurement for project XDQU-2023-00004, which supports the 253d Cyber Space Engineering Installation Group (CEIG) localized detachment elements. This requirement covers a comprehensive package of commercial infrastructure components, physical fiber routing assets, microduct systems, racks, cable management hardware, tools, and testing consumables. These materials facilitate the 165 AW Add 144 SM FOC CN to AN Edge Switches project under solicitation number W50S8026Q0012. The acquisition is classified under NAICS 334417 Electronic Connector Manufacturing and PSC 6015 FIBER OPTIC CABLES.
The Department of the Army has designated this pre-solicitation as an SBA SBA set-aside. Procurement items are specified on a brand name or equal basis, referencing manufacturers such as Corning, Dura-Line, Fluke Networks, and Panduit to establish necessary standards for quality and function. The government intends to solicit quotes directly from a minimum of three qualified small business sources. Supporting documentation for this requirement includes two technical spreadsheets posted as attachments on June 1, 2026, and June 3, 2026.
The response deadline for this notice is June 16, 2026, with an anticipated contract award date on or about July 10, 2026. The contract will be awarded to the responsible, solicited offeror who provides the lowest total price meeting all technical material specifications. All ordered assets must be delivered freight-on-board destination to the 165 AW / 130 EIS facility in Savannah, Georgia. Isao Hattori is the designated point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.