Name | Type | Posted | Actions |
|---|---|---|---|
200131_Specifications_Rev. 01.pdf | Jun 3, 2026 | ||
FA813726R0010-0002_Formal RFP_Conformed.pdf | Jun 3, 2026 | ||
FA813726R0010-0002_Formal RFP_SF 30.pdf | Jun 3, 2026 | ||
FA813726R0010-0001_Formal RFP_Conformed.pdf | May 27, 2026 | ||
Section L_Instructions to Bidders (2-Step)_Revised.docx | DOCX | May 27, 2026 | |
FA813726R0010-0001_Formal RFP_SF 30.pdf | May 27, 2026 | ||
200131_Pre-Bid RFIs_Project Pics_Att. 3.pptx | PPTX | May 18, 2026 | |
200131_Pre-Bid RFIs_Utility Site Map Legend_Att. 2.pdf | May 18, 2026 | ||
200131_Pre-Bid RFIs_Utility Site Map_Att. 1.pdf | May 18, 2026 | ||
200131_Pre-Bid RFIs_Gov. Responses_Revised.pdf | May 18, 2026 | ||
200131_Pre-Bid RFIs_Asbestos Report_Att. 5.pdf | May 18, 2026 | ||
200131_Pre-Bid RFIs_Geotechnical Report_Att. 4.pdf | May 18, 2026 | ||
200131_Pre-Bid RFIs_Gov. Responses_Revised.pdf | May 18, 2026 | ||
FA813726R0010_Formal RFP.pdf | May 7, 2026 | ||
Section M_Evaluation Factors for Award (2-Step)_Revised.docx | DOCX | May 7, 2026 | |
200131_SOW.pdf | May 7, 2026 | ||
Section L_Instructions to Bidders (2-Step)_Revised.docx | DOCX | May 7, 2026 | |
200131_WD-OK20250049_Mod 1_OK County.pdf | May 7, 2026 |
Formal RFP for WWYK200131 - Repair Chilled Water System, Bldg. 2280
Contact and place of performance
Sharla Flowers
S Coffeyville, OK 73145
USA
This requirement is to be solicited as a total small business set-aside. The work to be performed under the terms of this contract consists of furnishing all materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair of the chilled water system at B2280 at Tinker Air Force Base (AFB), Oklahoma ( project drawings can be provided to int...
View moreThis project will require contractor personnel to perform work and/or operate vehicles on flight lines, runways, taxiways, parking ramps or in aircraft hangers or maintenance areas. Thus, all contractor personnel will be required to receive FOD awareness training in accordance with Tinker Air Force Base Instruction (Tinker AFBI) 21-100.
IAW National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171, the requirement does not include CUI to reside on or transit through contractor and/or subcontractor systems.
Site visit attendance is mandatory to be considered responsive. RSVP email confirmation of intent to attend site visit to the primary and secondary points of contact with Entry Authorization List (EAL) information is due by 11:59 PM CST, Monday, March 30th, 2026. If a Contractor/Subcontractor fails to meet this deadline, the site visit information will not be released to your organization. Contract documents not able to be uploaded to SAM.gov will be provided to contractors who RSVP'd their intent to attend the initial site visit.
Attachments include an EAL spreadsheet, please fill-in all information for individuals who will need/do not currently have Base access. Please ensure all information requested in the EAL is filled out accurately and full names matching state-issued IDs are utilized to assure Security Forces can process the requests for Base Access in a timely manner. If an individual has Base access, their name is all the information needed. Please try to limit your parties to seven attendees per Contractor.
The requirement will be awarded in accordance with Two-Step Sealed Bidding procedures (FAR 52.214-25) which calls for the initial submission of technical-only proposals before submission of price bids. As such, please plan on coordinating all necessary personnel and/or subcontractors whose assessment of the requirement will have an impact on the technical proposal and subsequent priced proposal. An additional site visit will not occur between receipt of the technical proposals and submission of price bids.
The site visit is scheduled for April 10th, 2026 at 10:00 A.M. We will meet outside of the airfield walk gate just north of Bldg. 2280 at 10:00 A.M. More specific meeting details have been shared with vendors who have sent an RSVP.
The due date for the RFIs arising from the initial site visit is April 21st, 2026 at 11:59 P.M. Please submit all RFIs to the primary and secondary points of contact. RFIs will be answered in a timely manner, and RFI responses will be shared with all site visit attendees.
All RFI responses have been received and compiled. Please see the attachments for the RFI responses and their associated documents. Utilize these in continuing to formulate your Step One Technical Proposals.
This notice signifies the release of the formal RFP for Project No. WWYK200131 - Repair Chilled Water System, Bldg. 2280. The due date for Step One Techincal Proposals has been extended to June 15th, 2026 at 5:00 PM CST. Please see the attachments for the formal RFP as well as the attachments referenced in the body of the formal RFP. Responses to previously received RFIs may warrant revisions to associated RFP documents so be sure to monitor this SAM posting for updates.
The revised RFI responses are now attached. The responses provide additional clarification on some replies for utilization by offerors in formulating their Step One Technical Proposals. The revised responses are highlighted. Please reach out to the primary or secondary point of contact should you have more questions regarding the responses.
An amendment to the formal RFP and a revision to Section L - Instructions to Bidders has been issued to update the amount of the bid guarantee to encourage offeror participation to the maximum extent possible. The due date for Step One Technical Proposals has not been extended, and all other terms and conditions of the solicitation and Section L remain unchanged and in full force and effect. Please refer to the amended RFP and revised Section L in the attachments section of this notice for more information.
An additional amendment has been made to the formal RFP to extend the due date for Step One Technical Proposals to June 15th, 2026 at 5:00 PM CST. This is to allow offerors additional time to assess equipment selection, availability, and associated pricing. Supplemental verbiage has also been added to the specifications to provide additional guidance for connecting the controls to the front end of the chilled water system. All other terms and conditions of the solicitation and associated documents remain unchanged and in full force and effect. Please refer to the amended RFP and the revised specifications in the attachments section of this notice for more information.
Point of clarification: The bid guarantee isn't required until Step Two Priced Bids are due. Offerors may acquire a bonding letter from their surety as an assurance, but it is not mandatory. Failure to furnish a bid guarantee in the proper amount may be a cause for rejection of an offeror's bid.
The Department of the Air Force, AFSC PZIOC, has issued solicitation FA813726R0010 for the repair of the chilled water system at Building 2280 at Tinker Air Force Base, Oklahoma. This construction-only project requires the contractor to provide all materials, labor, tools, equipment, and testing services necessary for a complete and functioning system. Work includes identifying logistical, architectural, and structural elements based on provided drawings and specifications. Because performance occurs in maintenance areas and on flight lines, all contractor personnel must undergo Foreign Object Damage (FOD) awareness training. The project is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z1AA for Maintenance of Office Buildings.
This procurement is a total small business set-aside (SBA). The government is utilizing Two-Step Sealed Bidding procedures, requiring the submission of technical proposals before price bids. Mandatory site visit attendance was required to be considered responsive, and those who attended received project drawings and access to request-for-information (RFI) responses. The place of performance is South Coffeyville, Oklahoma, and the response deadline for Step One technical proposals is June 15, 2026, at 5:00 PM CST. Sharla Flowers is the designated point of contact for this requirement.
The solicitation includes 18 attachments, such as revised specifications, conformed formal request for proposals (RFP) documents, and updated instructions to bidders. Amendments to the RFP have been issued to extend the proposal deadline and update the bid guarantee requirements, which are mandatory for Step Two but not required for Step One. Offerors must field-verify all floor plan layouts, dimensions, and utility locations provided by the government during the performance of the contract. National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 standards apply, though the requirement does not involve controlled unclassified information (CUI) residing on contractor systems.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.