Name | Type | Posted | Actions |
|---|---|---|---|
J_5__Specs_(180_Pages).pdf | Jun 8, 2026 | ||
J_4__Permits_Combined_(77_pages).pdf | Jun 8, 2026 | ||
J_3__Drawing_Binder_11_x_17_(12_pages).pdf | Jun 8, 2026 | ||
J_2__Bid_Bond_(4_pages).pdf | Jun 8, 2026 | ||
J_1__Wage_DOL_No__WA20260045_Grant_05_18_26_(6_pages).pdf | Jun 8, 2026 | ||
140R1026B0001_Solicitation_(Steamboat).pdf | Jun 8, 2026 | ||
Sol_140R1026B0001.pdf | Jun 8, 2026 |
Steamboat Rock State Park Shoreline Stabilization
Contact and place of performance
Naseath, Michael
Electric City, WA 99123
USA
The General intent of this work is to protect the existing bank slopes from further erosion.
The Bureau of Reclamation has issued solicitation 140R1026B0001 for shoreline stabilization at Steamboat Rock State Park in Electric City, Washington. The primary purpose of this project is to protect existing bank slopes from further erosion. This requirement is classified under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC Y1PZ for Construction of Other Non-Building Facilities.
This opportunity is designated as an Indian Small Business Economic Enterprise (ISBEE) set-aside. Interested parties must submit their responses by the deadline of July 8, 2026. Michael Naseath serves as the point of contact for this procurement.
The solicitation includes seven attachments published on June 8, 2026, including the formal solicitation document, technical specifications, a drawing binder, permit documentation, a bid bond form, and Department of Labor wage determinations. These materials outline the specific construction requirements and site conditions for the performance of the work at the designated location in Grant County.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.