Name | Type | Posted | Actions |
|---|---|---|---|
1. RFP Letter 6.1.2026 R1.docx | DOCX | Jun 2, 2026 | |
RFP Argon Piping R1 6.1.2026.docx | DOCX | Jun 2, 2026 | |
J-1 FFDG General Terms and Conditions for Construction at SURF (08.2025).pdf | Jun 2, 2026 | ||
J-2 2025 INSURANCE REQUIREMENTS FOR FRA SUBCONTRACTED WORK AT SURF Risk category 3 (Rev 01.pdf | Jun 2, 2026 | ||
J-3 Argon Piping Supply and Install SOW (2).docx | DOCX | Jun 2, 2026 | |
J-4 SDSTA Risk Transfer Protocol Manual Final July 12 2024.pdf | Jun 2, 2026 | ||
J-5 010010_General_Requirements_SD_4_2025_FFDG.docx | DOCX | Jun 2, 2026 | |
J-6 013100_7-31-2025 FermiForward_South_Dakota.pdf | Jun 2, 2026 | ||
J-6.1 7010_F1_Fermilab Subcontractor Safety Information Questionnaire.docx | DOCX | Jun 2, 2026 | |
J-7 014100-8-2025-South Dakota Quality Requirements.pdf | Jun 2, 2026 | ||
J-9 FL-55 Small Business Subcontracting Plan (Rev. 6-23) 14.0 - Exhibit III-G.pdf | Jun 2, 2026 | ||
J-10 South Dakota Wase Determinatin 20260016.txt | TXT | Jun 2, 2026 | |
J-11 Price Sheet including Fully Burdened Hourly Rate.xlsx | XLSX | Jun 2, 2026 | |
K-1 PUR-466_Proposal Certifications-.pdf | Jun 2, 2026 | ||
K-2 SARC_Subcontractor Annual RepsCerts Rev 4.pdf | Jun 2, 2026 | ||
K-4 FL-57B (Rev. 1-07).pdf | Jun 2, 2026 | ||
K-3 FL-11_Rev1.pdf | Jun 2, 2026 |
Argon Piping Supply, Installation and Testing
The Department of Energy, via its contractor Fermi Forward Discovery Group (FFDG), is seeking proposals for the supply, installation, and testing of a stainless-steel argon gas pipeline at the Long-Baseline Neutrino Facility (LBNF). This project supports the Deep Underground Neutrino Experiment (DUNE) and involves transporting approximately 40,000 metric tons of argon from surface stations to the Central Utility Cavern at the 4850 Level. The scope includes complex vertical and horizontal piping, featuring an 8-inch diameter pipeline from the surface to the Ross shaft, a 6-inch section descending the shaft, and a return to 8-inch piping leading into the underground cavern. Managed under solicitation number 73573, the work will take place at the Sanford Underground Research Facility (SURF) in Lead, South Dakota. Evaluation will follow a Best Value tradeoff methodology, though some documents reference Lowest-Price Technically Acceptable (LPTA) criteria. Key dates include a mandatory virtual pre-proposal meeting on June 23, 2026, a proposal deadline of July 27, 2026, and an expected award by October 10, 2026. The project has a 250-day performance period with a target completion of September 22, 2027. Requirements include a detailed Statement of Work, specialized safety and quality control protocols for SURF, and high-limit insurance coverage. Offerors must submit separate Technical and Price/Business volumes and provide certifications regarding organizational conflicts of interest and small business subcontracting plans. This project supports the Deep Underground Neutrino Experiment (DUNE) by installing infrastructure to transport 40,000 metric tons of liquid argon to the 4850 Level of the Sanford Underground Research Facility (SURF). The scope includes the supply, instal…
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Jerry King
Lead, SD 57754
USA
As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This...