No attachments available.
Application of Maneuver Access Structures (MAS) on Ft Hood Military Installation - IDIQ
Contact and place of performance
Chip Burnette
FORT HOOD, TX 76522
USA
UFL Option "B" was determined to be the best value for the Government. Task Order 01 was awarded for total price of $2,301,700.00 and a performance period not to exceed 105 days to install the guaranteed minimum requirement of 72,000 tons.
This award notice identifies the selection of UFL Option "B" for the application of Maneuver Access Structures (MAS) at the Fort Hood military installation in Texas. The government determined this option offered the best value, resulting in the award of Task Order 01 under solicitation number AG-7442-S-13-0055. This task order includes a total price of $2,301,700.00 and establishes a performance period not to exceed 105 days.
The scope of work involves installing a guaranteed minimum requirement of 72,000 tons of material. The project is classified under NAICS 237310 for Highway, Street, and Bridge Construction and PSC code Z. Point of contact Chip Burnette managed the award, which was officially published on September 18, 2013, with performance occurring at Fort Hood, Texas.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.