Name | Type | Posted | Actions |
|---|---|---|---|
DRAFT_B2_11_Section_M_Evaluation_Factors_Sector_30_Erosion_Mitigation.pdf | Jun 12, 2026 | ||
DRAFT_B2_10.1_Section_L_SLAC_Question&Answer_Log_(RFI).pdf | Jun 12, 2026 | ||
DRAFT_B2_10.0_Section_L_Instructions_to_Offerors_Sector_30_Erosion_Mitigation.pdf | Jun 12, 2026 | ||
DRAFT_B2_09.1_Reps_and_Certs_Supplement.pdf | Jun 12, 2026 | ||
DRAFT_B2_09.0_Section_K_(Rep_and_Certs).pdf | Jun 12, 2026 | ||
DRAFT_B2_08.08_Construction_Subcontracts_Final_Release.pdf | Jun 12, 2026 | ||
DRAFT_B2_08.07_Final_Inspection_Report.pdf | Jun 12, 2026 | ||
DRAFT_B2_08.06_NTP_Submittal_Checklist_061424.pdf | Jun 12, 2026 | ||
DRAFT_B2_08.05_SubcontractorFormSQF.pdf | Jun 12, 2026 | ||
DRAFT_B2_08.04_SF1413.pdf | Jun 12, 2026 | ||
DRAFT_B2_08.03_Work_Classification_Form_365203.pdf | Jun 12, 2026 | ||
DRAFT_B2_08.02_Subcontractor_Safety_IIPP.pdf | Jun 12, 2026 | ||
DRAFT_B2_08.01_DBA_WD_CA20250018_18MAY2026_Mod_05.pdf | Jun 12, 2026 | ||
DRAFT_B2_08.0_Section_J_(List_of_Attachments).pdf | Jun 12, 2026 | ||
DRAFT_B2_07_Section_I_(Specific_Subcontract_Clauses).pdf | Jun 12, 2026 | ||
DRAFT_B2_06_Section_H_(Special TsCs).pdf | Jun 12, 2026 | ||
DRAFT_B2_05.1_Fixed_Price_Construction_March2024.pdf | Jun 12, 2026 | ||
DRAFT_B2_05.0_Section_G_(General_TsCs).pdf | Jun 12, 2026 | ||
DRAFT_B2_04_Section_F_(Deliveries_Performance).pdf | Jun 12, 2026 | ||
DRAFT_B2_03.3_NEPA_env_compliance_checklist_Sect_30.pdf | Jun 12, 2026 | ||
DRAFT_B2_03.2_SLAC_Drawings_S30_Plans.pdf | Jun 12, 2026 | ||
DRAFT_B2_03.1_SOW_Sector_30_Erosion_Mitigation.pdf | Jun 12, 2026 | ||
DRAFT_B2_03.0_Section_C_(Specifications_SOW).pdf | Jun 12, 2026 | ||
DRAFT_B2_02_Section_B_(Supplies_or_Services_and_Price_Costs).pdf | Jun 12, 2026 | ||
DRAFT_B2_01_Section_A_(Subcontract_Form).pdf | Jun 12, 2026 | ||
DRAFT_B2_00_Cover_Letter.pdf | Jun 12, 2026 |
SLAC Sector 30 Erosion Mitigation Project
Contact and place of performance
Quyen Weng
Menlo Park, CA 94025
USA
DESCRIPTION This is a Sources Sought Notice to identify consultants to provide necessary construction work to mitigate soil erosion in an area referred to as Sector 30. This is not a solicitation for proposal or quotations and no award will be made from this Notice. SLAC intends to issue a formal solicitation later based on responses from this Source Sought Notice. PLANNED SCOPE AND DESCRIPTION OF SERVICES SLAC is se...
View moreThe full list of requirements can be found in the Statement of Work, IFC Drawing Package, and Project Specifications.
SOURCES SOUGHT RESPONSE
Interested firms with the skills and capability to complete the above scopes are invited to submit a written response to this Sources Sought Notice. Please provide the following information:
Please provide your response to Quyen Weng at [email protected] by 5 pm PST on June 18th, 2026.
SOURCES SOUGHT DISCLAIMER:
Please note that any responses to this sources sought posting is purely on a voluntary basis. SLAC is not requesting a proposal, any pricing, or any other information that could be considered confidential or proprietary to be submitted in response to this posting or any part of this posting. Any submissions that contain pricing, proprietary information, or confidential information will be discarded by SLAC.
The Department of Energy, through the SLAC National Accelerator Laboratory, has issued this sources sought notice to identify qualified general contractors for the Sector 30 Erosion Mitigation Project in Menlo Park, California. The primary objective is to address soil erosion by removing and replacing failed pavement, slopes, earthwork, and storm drains. The project scope includes installing permanent vegetation and erosion control measures along a hillside slope approximately 12 to 13 feet tall with gradients ranging from 1:1 to 4:1. The work area is situated near sediment basin structure 30F-7, which flows into catch basin 30F-11.
This requirement is classified under NAICS 236220: Commercial and Institutional Building Construction. Interested firms must submit their company name and a designated point of contact to Quyen Weng by the response deadline of June 19, 2026. The notice includes 26 draft attachments, such as instructions to offerors, evaluation factors, and representative certifications, to provide context for the anticipated formal solicitation.
SLAC, a Department of Energy contractor, is conducting this market research to verify the availability of consultants capable of performing the specified construction services. As a sources sought notice, this announcement does not constitute a request for proposal or a commitment to award a contract. Performance will take place at the SLAC facility under solicitation number SLAC_RFP_365203.
Generated by Lumen AI