No attachments available.
NSN 1680-012378887, ELECTRICAL CONTROL PANEL, WSDC: 19F, AIRCRAFT, EAGLE F-15
Contact and place of performance
Tatjana Klemmer
Not specified
NSN: 1680-012378887, IQC PR: 1000206461, ITEM: ELECTRICAL CONTROL PANEL PARTS SHALL BE MANUFACTURED IN ACCORDANCE WITH BASIC DRAWING 76301 68A810389, REVISION E, DTD 05/15/2014, PART PIECE NUMBER 68A810389-1001. THE SOLICITATION WILL BE ISSUED AS A 100% SMALL BUSINESS SET-ASIDE (FULL AND OPEN COMPETITION AFTER THE EXCLUSION OF SOURCES). THIS PROCUREMENT IS FOR AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD O...
View moreThe Defense Logistics Agency is seeking to establish an Indefinite Quantity Contract (IQC) for the procurement of electrical control panels, identified by NSN 1680-012378887, for use on the F-15 Eagle aircraft. This solicitation, SPE4A725R0715, is categorized under NAICS 336413, Other Aircraft Parts and Auxiliary Equipment Manufacturing, and PSC 1680, Miscellaneous Aircraft Accessories and Components. The procurement is designated as a 100% Small Business Set-Aside (full and open competition after the exclusion of sources). Manufacturers must produce parts in accordance with basic drawing 76301 68A810389, Revision E, for part piece number 68A810389-1001.
The resulting contract will have a five-year base period with no options and an estimated annual quantity of eight units. Performance requirements include First Article Testing, with First Article units due 250 days after the date of order and a government evaluation period of 180 days. Production units are scheduled for delivery 250 days after First Article approval, with a standard delivery timeline of 680 days after order for subsequent requirements. First Article units require inspection at origin and acceptance at destination, while production units require both inspection and acceptance at origin. All units are to be delivered FOB Destination.
Access to required technical data is restricted to contractors certified by the Department of Defense via DD Form 2345. The solicitation process may include a reverse auction conducted through the Procurex system. The solicitation is expected to be issued on or about August 22, 2025, with a response deadline of August 22, 2025. Tatjana Klemmer serves as the point of contact for this requirement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.