Name | Type | Posted | Actions |
|---|---|---|---|
ATTCH 04 AF 3064 Progress Schedule.xlsx | XLSX | Mar 25, 2026 | |
Solicitation - FA330026R0016.pdf | Mar 25, 2026 | ||
ATTCH 03 PNQS25-5418 Blank AF3052.xlsx | XLSX | Mar 25, 2026 | |
ATTCH 05 WD AL20260093.pdf | Mar 25, 2026 | ||
ATTCH 01 PNQS25-5418 Rpr Afd Ele Sys Specs.pdf | Mar 25, 2026 | ||
ATTCH 02 PNQS25-5418 PNQS25-5418 Rpr Afd Ele Sys DWGS.pdf | Mar 25, 2026 |
Repair Airfield Electrical Systems
Contact and place of performance
Dartamien "Dee" Brown
Montgomery, AL 36112
USA
Contractor shall furnish all labor, materials and equipment necessary to perform all work in connection with Project Number PNQS 25-5418 Repair Electrical Systems Airfield at Maxwell AFB, Alabama. This is a Total Small Business Set-Aside and contractor must be located within 100 mile radius of Maxwell AFB. The magnitude of construction is between $1,000,000 and $3,000,000.
The Department of the Air Force, FA3300 42 CONS CC, has issued solicitation FA3300-26-R-0016 for Project Number PNQS 25-5418 to repair electrical systems at the Maxwell Air Force Base airfield in Montgomery, Alabama. The contractor must furnish all labor, materials, and equipment required to perform the electrical repairs. This procurement is classified under NAICS 238210 Electrical Contractors and Other Wiring Installation Contractors and PSC Z2BD REPAIR OR ALTERATION OF AIRPORT RUNWAYS AND TAXIWAYS.
This opportunity is a Total Small Business Set-Aside designated as SBA SBA, and the awarded contractor must be located within a 100-mile radius of Maxwell Air Force Base. The estimated magnitude of construction for this project is between $1,000,000 and $3,000,000. Six attachments support the solicitation, including project specifications, drawings, a progress schedule, a wage determination, a blank AF3052 form, and the primary solicitation document.
The response deadline for this solicitation is April 13, 2026, following its publication on March 25, 2026. Dartamien "Dee" Brown is the designated point of contact for this requirement. All work performed must adhere to the specifications and drawings associated with the airfield electrical systems project.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.