Name | Type | Posted | Actions |
|---|---|---|---|
Attachment_7_WD.pdf | Jun 5, 2026 | ||
Attachment_6_Spec_TPO_80_mil_roof.pdf | Jun 5, 2026 | ||
Attachment_5_Drawing_Roofsheet_Roofsheet_12_compressed.pdf | Jun 5, 2026 | ||
Attachment_4_Drawing_Roofsheet_11_compressed.pdf | Jun 5, 2026 | ||
Attachment_1_Statement_of_Work.pdf | Jun 5, 2026 | ||
Attachment_2_Drawing_Roofsheet_06-compresed.pdf | Jun 5, 2026 | ||
Attachment_3_Drawing_Roofsheet_07_compressed.pdf | Jun 5, 2026 | ||
Attachment_8_IEE_Reps.pdf | Jun 5, 2026 | ||
Sol_140A1626Q0044.pdf | Jun 5, 2026 |
Blackfeet Adult Detention Center Roof Replacement
The Bureau of Indian Affairs is soliciting the replacement of the roof at the Blackfeet Adult Detention Center, Building #126, in Browning, Montana. The project involves the complete removal of existing roofing and the installation of a fully adhered 80-mil Thermoplastic Polyolefin (TPO) system. The contract requires a 30-year total system warranty and must meet wind uplift pressures of up to 57.2 psf. This procurement is a competitive set-aside for Indian Small Business Economic Enterprises (ISBEE) under the Buy Indian Act. Work must be completed within 60 calendar days of the Notice to Proceed. The solicitation includes technical drawings, material specifications, and mandatory Indian Economic Enterprise (IEE) representation forms. Proposals are due by June 23, 2026, at 7:00 PM EDT. The government will award a firm-fixed-price contract to the responsible offeror with the lowest total evaluated price. Liquidated damages are set at $1,044 per day for delays. The Bureau of Indian Affairs is procuring a roof replacement for Building #126 at the Blackfeet Adult Detention Center in Browning, Montana. The work includes demolishing the current roof and installing a new 80-mil TPO membrane, along with insulation and drainage repairs. The Bureau of Indian Affairs requires a full roof replacement for Building #126 at the Blackfeet Adult Detention Center in Browning, Montana. The facility, built in 1970, has a 9,500-square-foot roof divided by a parapet wall. The project includes removing existing materials and installing a fully adhered 80-mil TPO system to fix water damage and drainage problems.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Egner, Kurt
Not specified
Blackfeet Adult Detention Center Roof Replacement