Name | Type | Posted | Actions |
|---|---|---|---|
S06_Amendment 36C78626B0009 0003.pdf | Jun 12, 2026 | ||
S06_Amendment 36C78626B0009 0002.pdf | Jun 7, 2026 | ||
S06_Amendment 36C78626B0009 0001.pdf | May 12, 2026 | ||
Attachment 3 Contract Performance Quality Assurance Report.pdf | May 8, 2026 | ||
Attachment 5 Initial HeadstoneMarker Raise and Realign Verification Survey.pdf | May 8, 2026 | ||
Attachment 2 Work Summary Progress Report Flats.pdf | May 8, 2026 | ||
Attachment 8 Contractors Employee Statement of Compliance.pdf | May 8, 2026 | ||
Attachment 7 Herbicide Application Data Sheet.pdf | May 8, 2026 | ||
Attachment 9 Contractors Daily Log of Construction.pdf | May 8, 2026 | ||
S02_36C78626B0009 National Shrine Project_Danville.pdf | May 8, 2026 | ||
Attachment 1 Scope of Work 809 NSP25 006.pdf | May 8, 2026 | ||
Exhibit D Flat Marker Realignment Diagrams.pdf | May 8, 2026 | ||
Exhibit C Upright Headstone Realignment Diagrams.pdf | May 8, 2026 | ||
Exhibit B Headstone Setting Details.pdf | May 8, 2026 | ||
Exhibit A Danville National Cemetery Renovation Areas.pdf | May 8, 2026 | ||
Exhibit E Example Site Survey Headstone Realignment and Grading Plans.pdf | May 8, 2026 | ||
Attachment 10 Work Summary Progress Report Uprights.pdf | May 8, 2026 | ||
Attachment 6 Daily HeadstoneMarker Raise Realign Verification Survey.pdf | May 8, 2026 | ||
Attachment 4 Contract Discrepancy Report.pdf | May 8, 2026 |
Danville National Cemetery – National Shrine Project 809-NSP25-006
This project involves renovating sections 13, 15, and 17 of the Danville National Cemetery in Illinois to meet National Shrine standards. Work includes land surveying, raising and realigning upright headstones and flat markers, turf renovation with sod, and cleaning existing markers. The procurement is a total set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated value between $500,000 and $800,000. The performance period is 365 calendar days. Turf renovation is restricted to seasonal windows from April to June or August to October. Daily operations must accommodate a 3:15 PM cutoff for government inspections. Amendment 0002 extended the bid opening to June 14, 2026, and clarified requirements for sod cultivars, laydown areas, and headstone replacement responsibilities. Project 809-NSP25-006 is a renovation effort at Danville National Cemetery to bring Sections 13, 15, and 17 up to National Shrine standards. This SDVOSB set-aside has an estimated value of $500,000 to $800,000. This project covers the renovation of burial sections 13, 15, and 17. The contractor provides management, labor, and equipment for surveying, marker realignment, turf renovation, and cleaning. Markers must remain on their gravesites at all times; removal from the site is prohibited.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Shane Hilts
Danville, IL 61832
USA
See attached solicitiation documents