Name | Type | Posted | Actions |
|---|---|---|---|
33330226RF0010002 Amendment 0005.pdf | May 14, 2026 | ||
33330226RF0010002 Amendment 00004.pdf | May 7, 2026 | ||
Multi-Year Funding_1600103 Upgrade Sanitary and Storms_REVISED.pdf | Apr 28, 2026 | ||
33330226RF0010002 Amendment 0003.pdf | Apr 28, 2026 | ||
33330226RF0010002 Amendment 0002.pdf | Apr 21, 2026 | ||
33330226RF0010002 Amendment 0001.pdf | Apr 2, 2026 | ||
1600103 - BID SET - SPECIFICATIONS - APPENDIX.PDF | Mar 12, 2026 | ||
1600103 - BID SET - SPECIFICATIONS - VOL 2_signed.pdf | Mar 12, 2026 | ||
1600103 - BID SET - SPECIFICATIONS - VOL 1_signed.pdf | Mar 12, 2026 | ||
1600103 - BID SET - DRAWINGS - VOL 3_signed.pdf | Mar 12, 2026 | ||
1600103 - BID SET - DRAWINGS - VOL 2_signed.pdf | Mar 12, 2026 | ||
1600103 - BID SET - DRAWINGS - VOL 1_signed.pdf | Mar 12, 2026 | ||
NMNH Upgrade Sanitary and Storm System_Final.pdf | Mar 12, 2026 | ||
Release of Claim Form.pdf | Mar 12, 2026 | ||
Multi-Year Funding Document - SF 1600103 Upgrade Sanitary Storm R2.pdf | Mar 12, 2026 | ||
Payment Bonds.pdf | Mar 12, 2026 | ||
Performance bonds.pdf | Mar 12, 2026 | ||
1600103 NMNH Upgrade Sanitary and Storm System Bid Sch.xlsx | XLSX | Mar 12, 2026 | |
Davis Bacon.pdf | Mar 12, 2026 | ||
1600103 - Bid Set - Design Manual.pdf | Mar 12, 2026 |
Upgrade Sanitary and Storm Systems at the National Museum of Natural History
Contact and place of performance
Virginia Chan
DC 20560
USA
Amendment 0005 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation: Responses to RFIs for Questions 76-82 Addendum #1 Bid Due Date Extension --------------------------------------------------------------------------------------------------------- Amendment 0004 to the RFP is hereby issued and attached for download. The purpose of the...
View moreUpdated Multi-Year Document
---------------------------------------------------------------------------------------------------------
Amendment 0002 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following changes to the Solicitation:
2nd Site Visit
RFI Due Date Extension
Bid Due Date Extension
---------------------------------------------------------------------------------------------------------
Amendment 0001 to the RFP is hereby issued and attached for download. The purpose of the amendment is to make the following change to the Solicitation:
03/27 Site Visit Sign-in Sheet
---------------------------------------------------------------------------------------------------------
The Smithsonian Institution is seeking offers to upgrade Sanitary and Storm Systems project at the Smithsonian Institution's National Museum of Natural History located at 10th Street and Constitution Avenue NW, Washington, DC, as described herein and the Contract Documents, including, without limitation, in the Specifications and Drawings for SF Project No. 1600103 both dated December 5, 2025.
All of the requirements which the successful Offeror must meet concerning this project are set forth in detail in the solicitation Documents included with this Request for Proposal. Upon receipt of Technical and Cost Proposals and the selection of a successful Offeror, the Smithsonian Institution will execute a Fixed Price construction contract. The Smithsonian currently estimates that the fixed price for the entire project will exceed $10 Million.
The scope of this project includes the installation of a new sanitary and stormwater system throughout the Museum Main Building, East and West Wings to replace the existing infrastructure that has reached the end of its service life. Work must be executed with extreme care to protect the museum’s collections, exhibits, and research operations, and preserve its historic architecture features.
The major elements of work include, but are not limited to, the following:
All work must be conducted in accordance with applicable codes, historic preservation requirements, safety regulations, and Smithsonian Institution design and construction standards. Phasing plans must minimize disruption to ongoing museum operations, protect the public, and preserve the integrity of historic and scientific assets.
PRE-BID TOUR OF THE SITE
The Pre-proposal meeting is scheduled for Friday, March 27, 2026, at 9:00 AM Eastern Time.
REQUEST FOR CLARIFICATIONS
It is requested that all questions be sent in no later than April 14, 2026.
THE PROPOSAL DUE DATE IS TUESDAY, MAY 12, 2026, at 3:00 PM EASTERN STANDARD TIME (EST).
The subcontracting goals for this project are: 40% with small business concerns. At least 7% with Service-Disabled Veteran-owned small businesses (SDV).
Davis Bacon Building Wage Determination DC20260002 shall apply.
The Period of Performance for the Base Contract and Options 1-3, if exercised, is 740 Calendar Days from the date of Notice to Proceed.
The Smithsonian Institution has issued solicitation 33330226RF0010002 for the upgrade of sanitary and storm systems at the National Museum of Natural History in Washington, D.C. The project requires the installation of new infrastructure throughout the Main Building and the East and West Wings to replace systems that have reached the end of their service life. This requirement is classified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Y1JA for Construction of Museums and Exhibition Buildings. The agency intends to award a fixed-price construction contract for this project, with an estimated value exceeding $10 million and a total performance period of 740 calendar days from the notice to proceed.
The scope of work involves installing new sanitary and stormwater piping, rerouting lines away from sensitive exhibit and collection areas, and capping or removing abandoned infrastructure. Specific tasks include lead and asbestos abatement, tunnel system pipe installation, and the integration of new systems with existing external infrastructure. Contractors must also implement erosion and sediment control plans and replace roof scuppers while adhering to historic preservation requirements and Smithsonian safety standards. Performance must be phased to minimize disruptions to museum operations and protect public safety and scientific assets.
Responses to this solicitation are due by June 3, 2026. The project includes subcontracting goals of 40% for small business concerns and at least 7% for Service-Disabled Veteran-owned small businesses. Davis-Bacon Building Wage Determination DC20260002 is applicable to the contract. Documentation for this opportunity includes 20 attachments, such as the initial specifications and drawings for SF Project No. 1600103, site visit sign-in sheets, and five subsequent amendments addressing requests for information and bid due date extensions. Virginia Chan serves as the point of contact for this requirement.