Name | Type | Posted | Actions |
|---|---|---|---|
Amendment 01 to RFP 378957.pdf | Jun 5, 2026 | ||
Exhibit O_ Payment BondFL-42.pdf | May 5, 2026 | ||
Exhibit N_Bid Bond FL-41.pdf | May 5, 2026 | ||
Exhibit M_PUR-466_Proposal Certifications_r5_10.14.25.pdf | May 5, 2026 | ||
Exhibit L_SF1413-23a (1).pdf | May 5, 2026 | ||
Exhibit K_ Price Proposal Form.pdf | May 5, 2026 | ||
Exhibit J_Fermilab Subcontractor Safety Information Questionnaire.pdf | May 5, 2026 | ||
Exhibit L_SARC_Subcontractor Annual RepsCerts Rev 8.pdf | May 5, 2026 | ||
Exhibit H_2025 Construction Insurance Requirements.pdf | May 5, 2026 | ||
Exhibit P_ DBA WD IL2026008 Mod 1_1.9.26.pdf | May 5, 2026 | ||
Exhibit F_014100 Quality Requirements - (1 QC Plan Not Required)-1.pdf | May 5, 2026 | ||
Exhibit E_013300 Submittals FermiForward.pdf | May 5, 2026 | ||
Exhibit D_013100_ESH_Requirements_04-2025 FFDG.pdf | May 5, 2026 | ||
Exhibit C_010010_General_Requirement_2025 FFDG.pdf | May 5, 2026 | ||
Exhibit B_Conduit path_ICB-A Angstrom E-Beam ECR Vacuum.pdf | May 5, 2026 | ||
Exhibit A_SOW - ICB -A Angstrom E-Beam ECR Vacurm.pdf | May 5, 2026 | ||
1.0 RFP Instructions to Offerors_378957.pdf | May 5, 2026 | ||
Exhibit G_FFDG General Terms and Conditions for Construction (08.2025).pdf | May 5, 2026 |
Fermilab-ICB-A Angstrom E-Beam ECR Vacuum Electrical Feed-DG
Fermi Forward Discovery Group, LLC (FFDG), the contractor for Fermi National Accelerator Laboratory, is seeking proposals for electrical infrastructure installation to support the ICB-A Angstrom E-Beam ECR Vacuum project. The scope includes labor, equipment, and materials for new feeders, conduit systems, junction boxes, and safety switches for an Angstrom E-Beam ECR Vacuum Deposition System and a Haskris Chiller. This is a small business set-aside under NAICS 238210. Evaluation is based on a Lowest Price Technically Acceptable (LPTA) methodology. Technical specifications require Square D breakers and 1 1/4 inch conduit. Amendment 01 modified the conduit routing to bypass an existing 6x6x4 junction box and run directly into the panel, while extending the response deadline to June 12, 2026. The project is governed by sixteen exhibits (A through P) covering technical, legal, and administrative requirements, including a 20% bid guarantee, insurance limits between $1M and $5M, and site access protocols. Subcontractors must adhere to Davis-Bacon Act wage determinations and provide three years of Workers' Compensation Experience Modification Rates (EMR). The subcontractor is responsible for all project aspects, including transportation, bonding, insurance, safety, and quality control. Technical requirements specify 1 1/4 inch conduit and Square D breakers. Per Amendment 01, the conduit must bypass an existing junction box. Performance is governed by exhibits covering ES&H, quality assurance, and federal labor standards. Compliance with 10 CFR 851 and 10 CFR 835 safety and administrative protocols.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Dasia Guthrie
Not specified
The Subcontractor shall perform all work as described in the Statement of Work for the ICB-A Angstrom E-Beam ECR Vacuum included as Exhibit A and drawing included as Exhibit B. All work shall include transportation, overhead, bonding costs, insurance, safety oversight, quality control oversight, and supervision as required to construct the project described in the scope of work, and the detailed description contained herein.