Name | Type | Posted | Actions |
|---|---|---|---|
CAV AF Reporting Requirements.docx | DOCX | Aug 30, 2021 | |
DID 81838_CAV Reporting.pdf | Aug 30, 2021 | ||
DID 80441C_Government Property Inventor Report.pdf | Aug 30, 2021 | ||
Contract Data Requirements List.pdf | Aug 30, 2021 | ||
DID 81995_Contract Depot Maintenance Production Report.pdf | Aug 30, 2021 | ||
Statement of Work.docx | DOCX | Aug 30, 2021 | |
DID 80969_Surge Plan.pdf | Aug 30, 2021 | ||
Special Packaging Instructions.pdf | Aug 30, 2021 | ||
Transportation Data.pdf | Aug 30, 2021 | ||
DID 80503_Shipping and Packing Discrepancy.pdf | Aug 30, 2021 | ||
Packing Requirements.pdf | Aug 30, 2021 | ||
FA811821R0044.pdf | Aug 30, 2021 |
Remanufacture of F-16 Heat Exchanger
Contact and place of performance
David O'Rourke
Not specified
Description: Remanufacture/Recore of F-16 Heat Exchanger. The Heat Exchanger, Air-to-Air and primary and secondary. Cools jet engine bleed air. Remanufacture: 5 year Indefinite Delivery/Indefinite Quantity (ID/IQ) contract will be solicited. IPE May be required Over and Above: To Be Negotiated (as needed). Data: Not Separately Priced Application: F-16. Destination: TBD. Delivery: 8EA per Month Beginning 30 days After...
View moreThe Department of the Air Force, specifically the AFSC PZABB division, is soliciting a five-year Indefinite Delivery/Indefinite Quantity contract for the remanufacture and recore of F-16 air-to-air primary and secondary heat exchangers. These components are used to cool jet engine bleed air. The procurement is classified under NAICS 336413, Other Aircraft Parts and Auxiliary Equipment Manufacturing, and PSC 1660, Aircraft Air Conditioning, Heating, and Pressurizing Equipment. This requirement is designated as a small business set-aside (SBA).
The remanufacturing process follows government-owned technical orders and written procedures, with an Initial Production Evaluation potentially required. Deliveries are scheduled at a rate of eight units per month, beginning 30 days after the receipt of the order or the reparable units, whichever occurs later. While the destination is to be determined, any unit with a price exceeding $5,000 will be subject to Unique Identification (UID) requirements. The contract also includes provisions for over and above work to be negotiated as needed and data that is not separately priced.
Solicitation FA811821R0044 was published on August 30, 2021, and carries a response deadline of September 29, 2021. Documentation supporting this effort includes 12 attachments such as a Statement of Work, Contract Data Requirements List, and various reporting requirement forms. David O'Rourke serves as the primary point of contact for this notice. Specific qualification requirements apply to this acquisition, and an ombudsman is available to address concerns regarding the proposal development phase.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.