Name | Type | Posted | Actions |
|---|---|---|---|
Service for NERC Compliances 12 05 2025 (2).pdf | Jun 1, 2026 |
Intent to sole source services for compliance with Texas RE and ERCOT
Contact and place of performance
Seone Michael Jones
Del Rio, TX 78840
USA
Completion of services for Amistad Power Plant Consultant Services to assist in de-register with NERC/ ERCOT/ Texas RE compliances standards and oversee American Electric Power (AEP) with Transmission Studies Analysis that will help Amistad Power Plant with de-registration process.
The United States Section of the International Boundary and Water Commission (USIBWC) issued this special notice under solicitation number FY265281001 regarding an intent to sole source consulting services for the Amistad Power Plant in Del Rio, Texas. The selected consultant will provide technical assistance to facilitate the plant's de-registration from North American Electric Reliability Corporation (NERC), Electric Reliability Council of Texas (ERCOT), and Texas Reliability Entity (Texas RE) compliance standards. The scope includes overseeing American Electric Power (AEP) during Transmission Studies Analysis required to complete the de-registration process.
This requirement is classified under NAICS 813920 for Professional Organizations and PSC R425 for Support- Professional: Engineering/Technical. Responses to this notice are due by June 16, 2026, and the primary point of contact is Seone Michael Jones. Documentation associated with this notice includes a single PDF attachment titled Service for NERC Compliances 12 05 2025 (2).pdf, which was published on June 1, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.