Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | Mar 26, 2026 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 26, 2026 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 26, 2026 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W50S7W26RA005¬iceType=SolicitationNotice | LINK | Mar 26, 2026 |
122FW - Fort Wayne, IN - Bldg 770 Fire Crash/Rescue Station Addition/Alteration
Contact and place of performance
Lisa Crose
46809
***Updated and FINAL verbiage for RFIs 19 and 20. All other responses remain unchanged from Update # 0005*** DUE DATE has been extended to 29 MAY 2026 at 3:00pm EDT due to pending RFI answers PROJECT TITLE: B770, FIRE STATION ADDITION/ALTERATION PROJECT NUMBER: ATQZ229030 NON-PERSONAL SERVICES TO PROVIDE THE RENOVATION AND ADDITION IN SUPPORT OF THE 122ND FIGHTER WING FIRE DEPARTMENT BUILDING 770, INDIANA AIR NATIONA...
View moreThe Department of the Army, specifically the W7M7 USPFO Activity INANG 122, is soliciting bids for project ATQZ229030, which involves the renovation and addition of Building 770 for the 122nd Fighter Wing Fire Department. Located at the Indiana Air National Guard Base in Fort Wayne, Indiana, the project requires non-personal services to perform functional repairs and alterations to the existing building’s roof, lightning protection, exterior envelope, fire protection, and HVAC systems. New construction will include an apparatus bay, sleeping quarters, and administrative, storage, and equipment support areas. Special construction requirements include an automated roll door system and a vehicle exhaust extraction system.
This solicitation is categorized under NAICS 236220 Commercial and Institutional Building Construction and PSC Y1BZ Construction of Other Airfield Structures. It is designated as an SBA Small Business Administration set-aside with a target price range between $7,000,000 and $9,000,000. Interested parties must submit their responses by the deadline of May 29, 2026, at 3:00 p.m. EDT. Lisa Crose serves as the primary point of contact for this requirement.
The procurement process includes a pre-proposal conference and site visit scheduled for April 10, 2026, at 2:00 p.m. local time. All technical inquiries related to the pre-bid conference were due by April 8, 2026. Documentation for this notice includes one PDF attachment published on March 26, 2026. Construction will utilize conventional design and construction methods to accommodate the facility’s mission.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.