Name | Type | Posted | Actions |
|---|---|---|---|
RFI_230077.230101_Mech.Elec_FINAL_Rev01_01162024.xlsx | XLSX | Jan 16, 2024 | |
ATTACH19_AF3065_BLANK_SAMPLE.xlsx | XLSX | Jan 2, 2024 | |
ATTACH24_B670_Fire Plan.pdf | Jan 2, 2024 | ||
ATTACH25_B670_Drawing_Floor Plan.pdf | Jan 2, 2024 | ||
RFI_230077.230101_Mech.Elec_FINAL_01022024.xlsx | XLSX | Jan 2, 2024 | |
ATTACH01_SOW_MechElec_Rev03_12292023.pdf | Jan 2, 2024 | ||
FA850124R00010001_01022024.pdf | Jan 2, 2024 | ||
ATTACH18_AF3064_BLANK_SAMPLE.xlsx | XLSX | Jan 2, 2024 | |
Mech.Elec.2_site.visit.attendance_14Dec2023.pdf | Dec 19, 2023 | ||
ATTACH10_SUBMITTAL REGISTER.XLS | XLS | Nov 9, 2023 | |
ATTACH11_TEMPLATE_Schedule of Values_BLANK.PDF | Nov 9, 2023 | ||
ATTACH12_Master Utility Outage.PDF | Nov 9, 2023 | ||
ATTACH13_Form 911 DesignDiscipline Review.docx | DOCX | Nov 9, 2023 | |
ATTACH14_DD1354(BLANK)_SAMPLE.PDF | Nov 9, 2023 | ||
ATTACH15_AF2586 Flightline Driving Request.PDF | Nov 9, 2023 | ||
ATTACH16_AF3000_MaterialSubmittal.PDF | Nov 9, 2023 | ||
FA850124R0001_FINAL_00_11092023.pdf | Nov 9, 2023 | ||
ATTACH18_AF3064_BLANK_SAMPLE.pdf | Nov 9, 2023 | ||
ATTACH19_AF3065_BLANK_SAMPLE.pdf | Nov 9, 2023 | ||
ATTACH20_WD_GA20230322_07212023.pdf | Nov 9, 2023 | ||
ATTACH21_230101DEMO_SOW_07102023.pdf | Nov 9, 2023 | ||
ATTACH22_230101DEMO_Bid Schedule_BLANK.pdf | Nov 9, 2023 | ||
ATTACH23_230101DEMO_SubmittalRegister.xlsx | XLSX | Nov 9, 2023 | |
ATTACH05_AFMAN 32-1084 Civil Engineering Facility Requirements.PDF | Nov 9, 2023 | ||
ATTACH17_AF3052_BLANK_SAMPLE.XLS | XLS | Nov 9, 2023 | |
ATTACH01_SOW_MechElec_Rev02_08112023.pdf | Nov 9, 2023 | ||
ATTACH02_Robins BFS 2022.pdf | Nov 9, 2023 | ||
ATTACH03_ProceduralGuide_DesignersAE_2023.PDF | Nov 9, 2023 | ||
ATTACH04_AFMAN 31-116 Motor Vehicle Traffic Supervision.PDF | Nov 9, 2023 | ||
ATTACH06_Asbestos Management Plan_2015.PDF | Nov 9, 2023 | ||
ATTACH07_ICD705_Construction and Management_SCIF.PDF | Nov 9, 2023 | ||
ATTACH08_AppC_Safety_053312023.PDF | Nov 9, 2023 | ||
ATTACH09_WR-ALC SAFE-T-GRAM.PDF | Nov 9, 2023 |
Robins AFB Mechanical/Electrical II IDIQ
Contact and place of performance
Kevin Hinman
Warner Robins, GA 31098
USA
The Civil Engineering Mechanical and Electrical Multiple Award Construction Contract II (Mech/Elec II) is an indefinite delivery-indefinite quantity (IDIQ) contract whose requirements will be competed among a pool of multiple awardees. This solicitation is a 100% set-aside to HUBZone certified businesses. Work may include but is not limited to: maintenance, repair, and alteration of mechanical, electrical and electri...
View moreThe Department of the Air Force, specifically the AFSC/PZIO contracting office, is soliciting proposals for the Civil Engineering Mechanical and Electrical Multiple Award Construction Contract II (Mech/Elec II) under solicitation number FA850124R0001. This requirement is an indefinite delivery-indefinite quantity (IDIQ) contract to be competed among a pool of awardees. The procurement is designated as a 100% set-aside for HUBZone (HZC) certified businesses under NAICS code 238220 for Plumbing, Heating, and Air-Conditioning Contractors and PSC Z2JZ for Repair or Alteration of Miscellaneous Buildings. Responses are due by January 19, 2024.
The scope of work involves furnishing all design, labor, equipment, material, transportation, and supervision necessary to perform maintenance, repair, and alteration of mechanical and electrical systems at Robins Air Force Base in Warner Robins, Georgia. Specific services include HVAC repairs and upgrades, asbestos remediation, underground fuel and water distribution systems, boiler replacement, and primary and secondary electrical upgrades. Performance also encompasses work on generators, airfield and interior lighting, lightning protection, fire suppression, and mass notification systems. Individual task orders will define the specific design and construction requirements for each project based on contract specifications and referenced documents.
The solicitation includes 33 attachments, such as updated Statements of Work, site visit participant lists, floor plans, and fire plans. Following a site visit held on December 14, 2023, the government issued amendments to incorporate various Requests for Information (RFI) and revised attachments. Kevin Hinman serves as the point of contact for this requirement. Task orders issued under the resulting IDIQ will be completed as required per the Mech/Elec II specifications and project-specific documentation provided at the time of order.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.