Name | Type | Posted | Actions |
|---|---|---|---|
PIEE Solicitation Module Link for FA860426RB011 | LINK | May 6, 2026 | |
Web based training for the PIEE solicitation module | LINK | May 6, 2026 | |
Registration instructions for the PIEE solicitation module | LINK | May 6, 2026 | |
Department of Defense Procurement Toolbox | LINK | May 6, 2026 | |
DFARS RFO Deviation Clauses Over SAT.pdf | May 6, 2026 | ||
NPT501-Contractor Information.pdf | May 6, 2026 | ||
NPT501- Appendix C - Mobile Storage System.pdf | May 6, 2026 | ||
Cover PD-Pittsburgh.pdf | May 6, 2026 | ||
NPT501- Appendix B - Pallet Rack.pdf | May 6, 2026 | ||
NPT501-02.pdf | May 6, 2026 | ||
NPT501- Appendix D - Rider Reach.pdf | May 6, 2026 | ||
NPT501-01.pdf | May 6, 2026 | ||
NPT501- Appendix A - Mezzanine.pdf | May 6, 2026 | ||
Addendums Pittsburgh.pdf | May 6, 2026 | ||
NPT501- Appendix E - Support Equipment.pdf | May 6, 2026 | ||
Solicitation - FA860426RB011.pdf | May 6, 2026 | ||
Checklist Summary Pricing Sheet Pittsburgh.pdf | May 6, 2026 | ||
Notification of Compliance with Contract Insurance Requirements Pittsburgh.pdf | May 6, 2026 |
Storage Aid System Pittsburgh ANGB
The Air Force Life Cycle Management Center (AFLCMC) PZI is soliciting proposals for a Material Mechanized Handling System at the Pittsburgh Air National Guard Base. This small business set-aside involves the design, manufacturing, and installation of a storage system for Building 110. The project includes mezzanine systems, pallet racks, mobile storage, and rider reach vehicles, along with site preparation and demolition. The contract is firm-fixed-price with a 240-day performance period. Proposals are submitted through the PIEE Solicitation Module by June 17, 2026. Technical requirements are defined in a Cover Purchase Description and five appendices, which outline a three-phase acceptance testing process covering checkout, quality conformance, and reliability. The work involves installing mezzanines, racks, and mobile storage units, plus site demolition and electrical reconfiguration. The performance period is 240 days. Site work includes removing modular walls and ceilings and reconfiguring 30 feet of electrical wiring. Work hours are 0700 to 1500, Monday through Friday.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Jennifer Jensen
PA 15108
USA
Amendment 0004 - Post additional RFI responses. No formal Amendment document added. Amendment 0003 - Update attachment 7 drawings, post RFI responses and extend proposal due date to 17 June 2026. Amendment 0002 - Extend proposal due date to 11 June 2026, 3PM EST and post RFI responses. Amendment 0001 - Update Attachment 11 - Checklist summery pricing sheet and attachment 14 - Technical Proposal Questionnaire. Storage...
View more