Name | Type | Posted | Actions |
|---|---|---|---|
36C26026R0076 Pre-Sol.docx | DOCX | Mar 24, 2026 |
Y1NA--CON | NRM 653-23-100 | Remove Replace Underground Fuel Tanks
Contact and place of performance
Kelly Updegraff
Roseburg 97471-6523
653-23-100 Remove and Replace Underground Fuel Tank This is a pre-solicitation notice synopsizing an upcoming competitive solicitation for a planned construction requirement. An invitation for Request for Proposals (RFP) is anticipated to be posted on or about 15 April 2026. The VA Medical Center located in Roseburg, OR, has a requirement for a Firmed Fixed Price construction project to remove underground fuel tanks...
View moreThe Department of Veterans Affairs, Veterans Health Administration (VHA) Network Contracting Office 20 (NCO 20), has issued a pre-solicitation notice for project 653-23-100 to remove and replace fuel tanks at the Roseburg VA Medical Center campus in Roseburg, Oregon. This requirement is classified under NAICS 237120, Oil and Gas Pipeline and Related Structures Construction, and PSC Y1NA, Construction of Fuel Supply Facilities. The project is 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBC). The agency anticipates issuing a formal Request for Proposals (RFP) on or about April 15, 2026, under solicitation number 36C26026R0076, with a response deadline of May 14, 2026.
The scope of work involves the demolition of existing underground fuel tanks and the construction of a new above-ground fuel farm across multiple campus locations. Specifically, the project includes decommissioning a 1,000-gallon tank at Building 2 and replacing it with an above-ground tank on a new concrete slab with fencing and bollards. At Building 7, a 12,000-gallon tank will be moved to the fuel farm for boiler use and replaced with a new 2,500-gallon above-ground tank. Work at the main fuel farm entails decommissioning four underground tanks of varying capacities, integrating the relocated 12,000-gallon tank, and installing new 20,000-gallon and 2,500-gallon tanks.
The estimated magnitude of this firm-fixed-price construction project is between $1,000,000 and $5,000,000. Award will be based on a best value determination, and the selected contractor must provide payment and performance bonds as well as a bid guarantee of at least 20 percent of the bid price. All work must adhere to the upcoming Statement of Work, specifications, and drawings. The primary point of contact for this requirement is Kelly Updegraff, and one attachment titled "36C26026R0076 Pre-Sol.docx" was posted with the notice on March 24, 2026.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.