Name | Type | Posted | Actions |
|---|---|---|---|
ISO194-22 AMD01 PG 1-8.pdf | Sep 29, 2022 | ||
SITE VISIT SIGN IN SHEET CONTINUED.pdf | Sep 22, 2022 | ||
SITE VISIT SIGN IN SHEET.pdf | Sep 19, 2022 | ||
202 Concept Drawings - Basement - VR5.pdf | Sep 2, 2022 | ||
202 Concept Drawings - 2nd Floor - VR4.pdf | Sep 2, 2022 | ||
202 Concept Drawings - 1st Floor - VR4.pdf | Sep 2, 2022 | ||
ISO194-22.pdf | Sep 2, 2022 | ||
FORM SF-25 PERFORMANCE BOND.pdf | Sep 2, 2022 | ||
FORM SF-24 BID BOND.pdf | Sep 2, 2022 | ||
FORMSF-25A PAYMENT BOND.pdf | Sep 2, 2022 | ||
ACH Vendor Enrollment Form 2022.pdf | Sep 2, 2022 | ||
PAST PERFORMANCE.pdf | Sep 2, 2022 |
Defense Acquisition University, Building 202,Renovation Project-Design Scope, Fort Belvoir, Virginia
Contact and place of performance
Jason Morgan
Fort Belvoir, VA 22060
USA
Provide a full renovation design and construction of DAU building 202 to include general meeting areas, executive offices, remote video conferencing suites, and open collaborative spaces that will support a healthier open air environment. The design shall also include secured communication spaces that are designed with an emphasis on efficiency in order to secure/store sensitive materials, along with restrooms, and a...
View moreThe Federal Prison System Bureau of Prisons has issued solicitation ISO194-22 for the full renovation design and construction of Building 202 at the Defense Acquisition University in Fort Belvoir, Virginia. This requirement is categorized under NAICS 541310 for Architectural Services and PSC C1CA for ARCHITECT AND ENGINEERING- CONSTRUCTION: SCHOOLS. The project is designated as an SBA set-aside. Responses are due by October 14, 2022, and should be directed to Jason Morgan.
The project scope encompasses the design and renovation of general meeting areas, executive offices, remote video conferencing suites, and collaborative spaces intended to support a healthy open-air environment. The design must include secured communication spaces for sensitive materials, as well as restrooms and a breakroom. Required technical upgrades involve the replacement of mechanical systems—specifically including Johnson Control METESYS BAS, dehumidification, and ultraviolet lighting—alongside electrical system upgrades, telecommunications improvements, and the addition of elevator access.
Interior renovations will include door and window repairs, painting, carpeting, and the creation of an open floorplan with dedicated storage. Exterior work requires renovating the building shell, replacing window wells, and increasing drainage capabilities for downspouts and wells. The solicitation includes 12 attachments, such as concept drawings for various floors, site visit sign-in sheets, and amendment documents. All proposals must include a signed copy of the solicitation amendment.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.