Name | Type | Posted | Actions |
|---|---|---|---|
J&A No. 19-16_Redacted.pdf | Dec 5, 2019 | ||
JA No. 19-15_Redacted.pdf | Nov 22, 2019 | ||
JA No. 19-14_Redacted.pdf | Nov 20, 2019 | ||
J&A_No._19-13_Redacted.pdf | Nov 7, 2019 | ||
https://www.neco.navy.mil/synopsis_file/N6247013D6019,%20-13D6020,%20-13D6021,%20-13D6022_JA_19-04_Final_Redacted.pdf | LINK | Dec 19, 2018 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Aug 22, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Aug 21, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Aug 17, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Aug 13, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Jul 24, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Jul 13, 2012 | |
https://www.neco.navy.mil/biz_ops/840-v5soln.aspx?soln=N6247012R5010 | LINK | Jun 28, 2012 |
Y--J and A for Increase in Capacity of Current NAVFAC Atlantic Global Contingency Construction (GCC) Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Contract (MAC)
Contact and place of performance
Amber Forehand-Hughes
Not specified
Justification andApproval for Increase in Capacity of Current NAVFAC Atlantic Global Contingency Construction (GCC) Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Contract (MAC)
The Department of the Navy, through the Naval Facilities Engineering Systems Command (NAVFACSYSCOM) Atlantic, issued solicitation N6247012R5010 regarding a Justification and Approval to increase the capacity of the current Global Contingency Construction (GCC) Indefinite Delivery / Indefinite Quantity (IDIQ) Multiple Award Contract (MAC). This requirement falls under NAICS code 236220 for Commercial and Institutional Building Construction and PSC Y1JZ for Construction of Miscellaneous Buildings. The primary point of contact for this action is Amber Forehand-Hughes.
The notice involves the expansion of contract capacity to support ongoing global contingency construction efforts. Documentation related to this increase includes four redacted Justification and Approval attachments issued between November 7, 2019, and December 5, 2019. While the initial solicitation was published on April 24, 2012, with a response deadline of June 23, 2013, the most recent update to the notice occurred on December 5, 2019.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.