Name | Type | Posted | Actions |
|---|---|---|---|
Solicitation Amendment FA527025R00170004 SF 30.pdf | Aug 4, 2025 | ||
Solicitation Amendment - FA527025R00170004.pdf | Aug 4, 2025 | ||
https://dodprocurementtoolbox.com/ | LINK | Jun 18, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Jun 18, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=FA527025R0017¬iceType=SolicitationNotice | LINK | Jun 18, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Jun 18, 2025 |
REPAIR CRACKS AND SPALLS, B43421
Contact and place of performance
Christopher Nicolas
96368
Amendment 0003: The purpose of this amendment is to serve as notification that solicitation FA527025R0017 - REPAIR CRACKS AND SPALLS, B43421, has been canceled. No other changes at this time Amendment 0002: The purpose of this amendment is as follows: A) Revise the proposal validity period to 69 calendar days. Block 13d is hereby changed to reflect this. B) Amend Section L regarding financial statements. Th...
View moreG) No other changes at this time.
NOTE: Refer to Sections L and M for further details on proposal submission changes.
Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation.
Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets to columns along gridlines. Repair to restore integrity of steel members that deteriorated due to corrosion, and replace steel members where material loss exceed 10% of the original thickness. Apply Fiber Reinforced Polymer (FRP) to canopy beams. Demolish existing ceiling tiles and install new tiles. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Demolish and dispose waste material as appropriate. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).Proposals must be submitted no later than 23 July 2025, 1400 (2:00pm) JST.
The Department of the Air Force, FA5270 18 CONS PK, issued solicitation FA527025R0017 for the repair of cracks and spalls at building B43421. This requirement is classified under NAICS 238110 Poured Concrete Foundation and Structure Contractors and PSC Z2JZ REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS. Amendment 0003 served as formal notification that this solicitation has been canceled. Christopher Nicolas is the designated point of contact for this notice, which includes two PDF attachments both titled Solicitation Amendment FA527025R00170004 and posted on August 4, 2025.
The original project scope involved repairing concrete walls, beams, columns, roof surfaces, floor slabs, and eaves. Specific tasks included installing concrete jackets on columns, restoring corroded steel members, and applying Fiber Reinforced Polymer to canopy beams. Work also required the demolition and installation of ceiling tiles, painting, and the abatement and disposal of Asbestos Containing Material and Lead-Based Paint. Design and construction activities were required to integrate sustainable principles and life cycle cost-effective practices in accordance with UFC 1-200-02, with on-site safety requirements coordinated through the 718th Civil Engineer Squadron.
While the metadata lists a response deadline of July 21, 2025, the solicitation description specified a closing date of July 23, 2025, at 2:00 p.m. JST. Prior to cancellation, amendments updated the proposal validity period to 69 calendar days and modified submission requirements for past performance and financial statements. These changes also removed the requirement for a bid guarantee and the application of clause FAR 52.228-1.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.