Name | Type | Posted | Actions |
|---|---|---|---|
36C24526R0025 0001.docx | DOCX | Jun 5, 2026 | |
Record of Attendance - Site Visit 6-3-2026 - Replace Boiler 3.pdf | Jun 5, 2026 | ||
VA Medical Center Clarksburg WV Boiler 3 Replacement Project Drawings Bid Documents 05 20 2025.pdf | May 28, 2026 | ||
SAM Wage Determination - 20260011 5-18-2026.pdf | May 28, 2026 | ||
36C24526R0025_1.docx | DOCX | May 28, 2026 | |
PCRA Replace Boiler 3 - AD signed .pdf | May 28, 2026 | ||
Past Performance Questionnaire 36C24526R0025.docx | DOCX | May 28, 2026 | |
LIMITATIONS ON SUBCONTRACTING-CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION.pdf | May 28, 2026 | ||
VAMedicalCenterClarksburgWV Boiler3Replacement Project Specification Bid Documents 05 20 2025 .pdf | May 28, 2026 |
Z1DA--REPLACE BOILER #3 CONSTRUCTION PROJECT NUMBER 540-22-103
The Department of Veterans Affairs is seeking construction services to replace Boiler #3 at the Louis A. Johnson VA Medical Center in Clarksburg, West Virginia. Project 540-22-103 requires removing an existing 350 HP water tube boiler and installing a new 350 HP fire tube boiler. This is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under solicitation 36C24526R0025. The work includes demolition, providing a temporary boiler to maintain facility operations, integrating controls, and performing necessary structural, mechanical, and electrical modifications. The performance period is 365 calendar days from the notice to proceed, with an estimated construction magnitude between $2,000,000 and $5,000,000. Technical specifications, 25 project drawings, and compliance forms are included in the solicitation package. Proposals are due by July 1, 2026, at 3:00 PM EDT. Proposals will be evaluated on technical approach, past performance, and price. The submission package must include the SF-1442, a price schedule, and a subcontracting compliance certificate. A pre-proposal site visit was held on June 3, 2026, and the RFI deadline was set for June 12, 2026. The contractor must provide and maintain a temporary boiler system to ensure continuous steam service to the medical center during the replacement process.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Rebecca L Besten
Not specified
SOLICITATION: 36C24526R0025 CONSTRUCTION: REPLACE BOILER # 3 PROJECT 540-22-103