Monument Rehabilitation at Piedmont Dam
Contact and place of performance
Aaron Barr
43983
The Contractor shall provide all labor, supplies, materials, and equipment to remove existing monument information plaque, restore information plaque, excavate area, form, pour and install new concrete pad, form and pour in place new monument base and re-install restored information plaque. The contractor shall excavate designated area as per Attachment 2. All excavated material shall be set aside for finish grading...
View moreThe U.S. Army Corps of Engineers, Pittsburgh District, issued this combined synopsis and solicitation under solicitation number W9123725QA075 for the rehabilitation of a monument at Piedmont Dam. This project is designated as a small business set-aside (SBA) and falls under NAICS code 238110 for Poured Concrete Foundation and Structure Contractors, along with PSC S208 for Housekeeping- Landscaping/Groundskeeping. The contractor is responsible for providing all labor, supplies, materials, and equipment required to restore an existing bronze information plaque and construct a new concrete foundation and monument base. Responses are due by September 22, 2025, and Aaron Barr is the primary point of contact for this requirement.
The scope of work involves removing and thoroughly cleaning an existing bronze plaque to a bright finish, repainting lettered sections black, and applying two coats of clear sealer. Structural requirements include excavating a designated area to accommodate a 20-foot by 20-foot concrete pad, which must be six inches thick and reinforced with wire mesh over a three-inch layer of 304 aggregate. The contractor will also form and pour a new monument base, the dimensions of which must be field-verified relative to the government-furnished plaque. Following construction, the site must be finish-graded using previously excavated material.
Updates provided on September 15, 2025, via Amendment 0001, modified several project attachments, updated the applicable wage determination (OH20250001), and incorporated guidelines for historic preservation. The solicitation also provides specific information regarding the U.S. Army Corps of Engineers' processes for settling requests for equitable adjustments and change orders. Although eight attachments are referenced in the description, including site diagrams and technical guidelines, the metadata indicates zero files are currently attached to the SAM.gov notice.
Generated by Lumen AI