Name | Type | Posted | Actions |
|---|---|---|---|
Combined synopsis rev1.pdf | Apr 13, 2026 | ||
Combined synopsis.docx | DOCX | Mar 23, 2026 | |
Attachment 4 E-Invoicing Instructions.pdf | Mar 23, 2026 | ||
Attachment 3 Vendor pricing sheetTD208.xlsx | XLSX | Mar 23, 2026 | |
Attachment 2 TD208.Government Furnished Equipment List.pdf | Mar 23, 2026 | ||
Attachment 1 Statement of work.pdf | Mar 23, 2026 |
TD-208 Pusher Tug FY26 Dry Docking
Contact and place of performance
Mr. Cory Lynch
Norfolk, VA
USA
The subject vessel is owned by the United States of America acting through the Maritime Administration, Department of Transportation (herein after called MARAD). Barring any weather related or unforeseeable delays, MARAD intends for the patrol boat to be delivered and tendered to the contractor’s facility within three working days of notice to proceed. MARAD will deliver the TD208 to the contractor’s faci...
View moreThe Maritime Administration has issued solicitation 6933A226Q000005 as a combined synopsis/solicitation for the dry docking and repair of the TD-208 Pusher Tug. This requirement is categorized under NAICS 336611 for Ship Building and Repairing and PSC J020 for MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT. The procurement is designated with an SBA; SBA set-aside. Work will be performed at a contractor facility located in the Hampton Roads area of Norfolk, Virginia, encompassing the James River, the Elizabeth River, the York River, Mobjack Bay, and their tributaries.
The period of performance for the dry-docking project is 45 days following the completion of delivery and tender. Barring weather-related or unforeseeable delays, the government will deliver the vessel to the contractor facility within three working days of the notice to proceed. A government representative will be stationed on-site during most production days, and the Maritime Administration will resume custody of the vessel at the contractor's facility once all services are performed and accepted.
Responses to this solicitation are due by April 30, 2026, and the primary point of contact is Mr. Cory Lynch. The notice includes six attachments: a statement of work, a government-furnished equipment list, a vendor pricing sheet, e-invoicing instructions, and two versions of the combined synopsis.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.