Name | Type | Posted | Actions |
|---|---|---|---|
Bid Abstract - MR562.xlsx | XLSX | Sep 29, 2025 | |
AMD 0008 R562Bid_Schedule 9.24.2025.pdf | Sep 24, 2025 | ||
Solicitation Amendment 0008 W9128F25BA0010008 SF 30.pdf | Sep 24, 2025 | ||
AMD 0007 - Att 0001 Bid Schedule.pdf | Sep 15, 2025 | ||
Solicitation Amendment 0007 W9128F25BA0010007 SF 30.pdf | Sep 15, 2025 | ||
AMD 0007 Amendment Narrative W9128F26BA001 Att 0003.docx | DOCX | Sep 15, 2025 | |
AMD 0007 - NE20250049 Nemaha Otoe County 9.4.2025.pdf | Sep 15, 2025 | ||
AMD 0007 - 31 35 19.16.pdf | Sep 15, 2025 | ||
AMD 0007 - 35 31 19.pdf | Sep 15, 2025 | ||
AMD 0007 - 01 22 00.pdf | Sep 15, 2025 | ||
AMD 0007 - R562Volume3_3DrawingsCF600toCF920R.pdf | Sep 15, 2025 | ||
AMD 0007 - R562Volume2of3DrawingsCF300toCF509R.pdf | Sep 15, 2025 | ||
AMD 0007 - R562Volume1of3DrawingsG003_CF272.pdf | Sep 15, 2025 | ||
Amendment 0006 SF30 W9128F25BA0010006.pdf | Jul 30, 2025 | ||
Amendment 0005 SF30 W9128F25BA0010005.pdf | Jul 23, 2025 | ||
R562Volume6of6DrawingsCF901_BI005.pdf | Jul 9, 2025 | ||
R562Volume5of6DrawingsCF651_CF871.pdf | Jul 9, 2025 | ||
R562Volume3of6DrawingsCF300_CF352.pdf | Jul 9, 2025 | ||
R562Volume4of6DrawingsCF361_CF621A.pdf | Jul 9, 2025 | ||
R562Volume1of6DrawingsG001_CF256.pdf | Jul 9, 2025 | ||
R562Volume2of6DrawingsCF256_CF272.pdf | Jul 9, 2025 | ||
Successful Step-1 Company List.docx | DOCX | Jul 8, 2025 | |
Amendment 0004 SF30 W9128F25BA001.pdf | Jul 8, 2025 | ||
Att 0001 BID SCHEDULE.pdf | Jul 8, 2025 | ||
Solicitation W9128F25BA0010004 Step Two.pdf | Jul 8, 2025 | ||
W9128F25BA001 R-562 Specs Step 2.pdf | Jul 8, 2025 | ||
Solicitation Amendment 0003 W9128F25BA0010003 SF 30.pdf | Jun 9, 2025 | ||
Site Visit Attendee List 5.6.2025.pdf | May 7, 2025 | ||
W9128F25BA0010002 SF 30.pdf | May 7, 2025 | ||
Solicitation Amendment W9128F25BA0010001 SF 30.pdf | Apr 30, 2025 | ||
R562-step-1-Plans_Vol1.pdf | Apr 16, 2025 | ||
Att 0002 W9128F25BA001 R-562 specs step1.pdf | Apr 16, 2025 | ||
R562-step-1-Plans_Vol3.pdf | Apr 16, 2025 | ||
R562-step-1-Plans_Vol2.pdf | Apr 16, 2025 | ||
Att 0004 - NE20250049 Nemaha Otoe County 3.14.2025.pdf | Apr 16, 2025 | ||
Att 0001 - MR-562 BID SCHEDULE.docx | DOCX | Apr 16, 2025 | |
Att 0002 - W9128F25BA001 R-562 specs.pdf | Apr 16, 2025 | ||
W9128F25BA001 Step 1.pdf | Apr 16, 2025 | ||
Att 0003 - PPQ forms.pdf | Apr 16, 2025 |
Missouri River Levee R-562 Repair
Contact and place of performance
Karen Caskey
Peru, NE 68421
USA
The Bid Abstract is posted. ___________________________________________________________________________________ AMD 0008 - The purpose of this amendment is to incorporate a revised bid schedule. The bid due date of September 29, 2025 at 2:00 PM remains the same. Bids should be submitted using the SF1442 from Amendment 0004 and the bid schedule from Amendment 0008. All eight amendments should be acknowledged on t...
View moreAMD 0005 - This amendment extends the due date for bids until 6 August 2025 at 2:00PM CST. Another amendment to plans and specifications is forthcoming.
____________________________________________________________________________________
AMD 0004 - Step Two specifications and solicitation are posted. Drawings are not uploading due to file size. Drawings will be posted ASAP after this issue is resolved.
____________________________________________________________________________________
AMD 0003 - This amendment incorporates Project Labor Agreement (PLA) requirements into Section 00 73 00 and Section 00 70 00 in FAR clauses 52.222-33 'Notice of Requirement for Project Labor Agreement Alternate I" and 52.222-34 'Project Labor Agreement'.
Due to the material nature of PLA requirements, the Step 1 proposal due date is extended to 17 June 2025 at 2:00 PM local time. New interested offerors may submit Step 1 proposals for consideration.
Interested offerors who have already submitted Step 1 proposals can let their proposal stand or submit a revised proposal by the due date/time. Any proposal revision should be highlighted or annotated in some manner that shows the change from the original proposal. Interested offerors who have already submitted Step 1 proposals will not be informed of their preliminary evaluation results.
The contracting officer will host a web meeting on 13 June 2025 at 1:00 PM local time to discuss the PLA topic. Interested offerors should RSVP to Karen Caskey at [email protected] and Lee McCormick at [email protected] with the email address(es) to send the meeting invite to and a list of participants.
_______________________________________________________________________________________________________
AMD 0002 - Offer Due Date has been changed to 16 May 2025 on or before 2:00PM CST, and the contract duration is extended from 547 days to 720 days.
_________________________________________________________________________________________________________
AMD 0001 - Offer Due Date has been changed to 13 May 2025 on or before 2:00 PM CST.
This amendment is issued to extend the due date to 13 May 2025 and update evaluation criteria in the Solicitation Document W9128F25BA0010001 under Section 00 21 00 Instructions, Number 6. Step-One Request for Technical Proposal Evaluation, Factor 2 – Past Performance Changes are in red).
All other terms and conditions remain the same.
_______________________________________________________________________________________________________
The U.S. Army Corps of Engineers, Omaha District, hereby announces the solicitation for The Missouri River Levee R562 Repair. The solicitation will close on 9 May 2025. The solicitation is restricted to Small Businesses.
Site Visit:
A Site Visit is scheduled and additional information regarding the site visit is provided in the solicitation via FAR Clause 52.236-27. The site visit is scheduled for 6 May 2025 at 0900 CST.
Project Description:
Missouri River Levee R562 Repairs include a combination of structural repair alternatives. The levee repairs include filling scour holes in the severely damaged levee sections, repairing critical levee sections, repairing crest damages, repairing riverside/landside erosion, rehabilitating relief wells, and replacing damaged drainage structures and pipes. May also require incidental material movement to facilitate floating plant access. The work will be in the general vicinity in/on/around/adjacent to the Missouri Riverbed and banks Peru, NE.
The Contractor will be required to commence work upon receipt of contract award and complete the work 547 calendar days after receipt of Notice to Proceed, this is subject to change after solicitation issuance.
Estimated Construction Costs
The estimated construction cost of this project is between $25,000,000 and $50,000,000.
NAICS Code:
The Primary North American Industry Classification System (NAICS) code for this solicitation is 237990, Other Heavy and Civil Engineering Construction, with a size standard for Small Business of $45M.
Obtaining Solicitation Documents:
Solicitation documents are posted to the web via SAM.gov (sam.gov).
Find solicitation announcement in SAM.gov (sam.gov).
Contracting Office Address:
USACE Omaha District
1616 Capital Ave, Omaha, NE 68102-4901
Point Of Contact:
All questions shall be submitted on ProjNet (ProjNet access, and additional guidance are contained within the solicitation).
Place of Performance:
Peru, Nebraska
Note: Offerors please be advised that an online registration requirement in System for Award Management (SAM) database http://www.sam.gov/ exists and directed solicitation provisions concerning electronic annual Representations and Certifications on SAM. Representations and certifications are required to be up-dated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective for one year from date of submission or update to SAM. Solicitation documents will be posted to the web via SAM.gov (sam.gov). Registration is required to access solicitation documents. SAM.gov provides secure access to acquisition-related information, synopsis or pre-solicitation notices and amendments.
The U.S. Army Corps of Engineers, Omaha District, is soliciting bids for the Missouri River Levee R-562 Repair project located in Peru, Nebraska. This project entails a variety of structural repairs, including filling scour holes in severely damaged levee sections, repairing critical sections and crest damages, and addressing riverside and landside erosion. Additional work involves the rehabilitation of relief wells, the replacement of damaged drainage structures and pipes, and incidental material movement to support floating plant access along the Missouri riverbed and banks.
This requirement is a Small Business Set-Aside (SBA) designated under NAICS 237990 Other Heavy and Civil Engineering Construction and PSC Z1KB MAINTENANCE OF CANALS. The estimated construction cost for the project ranges between $25,000,000 and $50,000,000. While the initial performance period was set at 547 calendar days, it has been extended to 720 calendar days following the issuance of the Notice to Proceed. The project also incorporates Project Labor Agreement (PLA) requirements into the contract terms.
The solicitation, identified by number W9128F25BA001, has a response deadline of September 29, 2025. Bidders must acknowledge all eight issued amendments and are directed to utilize the SF1442 provided in Amendment 0004 along with the bid schedule from Amendment 0008. There are 39 total attachments associated with this notice, including revised drawings, specifications, and a bid abstract. Karen Caskey is the primary point of contact for this procurement.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.