Y--PAIS WASTE WATER TANK REPLACEMENT
The National Park Service is seeking construction services to replace a wastewater tank at the Padre Island National Seashore (PAIS). This procurement is a 100% Indian Small Business Economic Enterprise (ISBEE) set-aside under solicitation number 140P6326Q0022. The work involves removing an existing 1,000-gallon concrete tank and installing a new 1,000-gallon polyethylene tank. The project includes site preparation, excavation, ballast anchoring, and system testing. The performance period is 60 calendar days. Technical requirements include compliance with the 2021 International Plumbing Code (IPC) and Texas Commission on Environmental Quality (TCEQ) regulations. The site has specific environmental constraints, such as high-water tables and restrictions related to turtle nesting seasons. Amendment 0001 adds a site visit sign-in sheet and a Q&A document that limits ground disturbance to a 20-foot boundary from the roadway edge. Quotes are due by June 22, 2026. The solicitation package includes the SF-1442, a Statement of Work, Davis-Bacon Act Wage Determinations for Nueces and San Patricio Counties, and an Experience Questionnaire. Evaluation will focus on technical capability, past performance on wastewater projects from the last three years, and the availability of key personnel and equipment. The National Park Service is replacing a failing 1,000-gallon concrete wastewater tank at Padre Island National Seashore with a new polyethylene unit. The project is governed by a firm-fixed-price contract and must be completed within 60 days of the notice to proceed. Technical standards include the 2021 International Plumbing Code and TCEQ regulations. Site preparation and excavation including shoring to prevent cave-ins during tank removal.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Kirk, Joseph
Not specified
This is request for quotation (RFQ) to procure construction services to replace wastewater tank at Padre Island National Seashore. The purpose of amendment 1 is to provide site visit and question and answer document as attachments to this solicitation.