Name | Type | Posted | Actions |
|---|---|---|---|
https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=W9124D14R0004 | LINK | Mar 26, 2015 | |
https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=W9124D14R0004 | LINK | Mar 12, 2015 | |
https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=W9124D14R0004 | LINK | Feb 27, 2015 | |
https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=W9124D14R0004 | LINK | Jan 15, 2015 | |
https://acquisition.army.mil/asfi/solicitation_view.cfm?psolicitationnbr=W9124D14R0004 | LINK | Dec 23, 2014 |
Z--Fort Knox KY DPW Construction MATOC
Contact and place of performance
Gloria Ritter, 502-624-5846 MICC Center - Fort Knox
Not specified
No narrative description provided for this notice.
The Mission and Installation Contracting Command (MICC) at Fort Knox, acting on behalf of the Department of the Army, issued solicitation W9124D-14-R-0004 for a Construction Multiple Award Task Order Contract (MATOC) supporting the Fort Knox Directorate of Public Works (DPW). The requirement is categorized under NAICS code 236220 for Commercial and Institutional Building Construction and PSC code Z. This acquisition is designated as an SBA set-aside.
The solicitation process for this procurement began with its initial publication on June 27, 2014, and concluded with a final response deadline of April 2, 2015. Contracting activities were managed through the MICC Center at Fort Knox by Gloria Ritter. As of the last update on March 26, 2015, the notice reached its final status with no additional attachments or specified place of performance details recorded in the metadata.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.