Name | Type | Posted | Actions |
|---|---|---|---|
USACE, St. Louis District | LINK | Aug 10, 2010 | Unavailable |
RECOVERY--Z--Project Number 111134, Wood River Drainage and Levee District - Closure Structures Rehabilitation, Mississippi River, Madison County, Illinois
Contact and place of performance
Becky Harsha, 314-331-8506 USACE District St. Louis
Not specified
Contract Award Amount equals $742,263.66 Recovery Funds, and $399,680.44 Non-Recovery Funds. Work consists of modification, reconstruction and repair of 22 closure structures. Three closure structures will be permanently closed by filling the opening with soil. Swing gates will be replaced at two sites and reconstructed at 13 sites. Gate reconstruction includes repair of steel and new paint and seals. Concrete sills at four sites will be repaired. Concrete abutments will be replaced at 2 sites and repaired at one site. Additional work includes sealing concrete at one location and resealing all expansions joints.
The Department of the Army, USACE District St. Louis, awarded solicitation number W912P910R0740 on August 10, 2010, for the Wood River Drainage and Levee District closure structures rehabilitation project along the Mississippi River in Madison County, Illinois. This project, identified under NAICS 236220 for Commercial and Institutional Building Construction and PSC Z, involves a total contract award of $1,141,944.10. Funding for this effort is split between $742,263.66 in recovery funds and $399,680.44 in non-recovery funds.
The scope of work encompasses the modification, reconstruction, and repair of 22 closure structures. Specific tasks include permanently closing three structures by filling openings with soil, replacing swing gates at two sites, and reconstructing gates at 13 sites. Gate reconstruction entails steel repair as well as the application of new paint and seals. Additionally, the contractor will repair concrete sills at four sites, replace concrete abutments at two sites, and repair an abutment at one site. Final requirements include sealing concrete at one location and resealing all expansion joints throughout the project area. Information regarding this award was published by the primary point of contact, Becky Harsha.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.