Name | Type | Posted | Actions |
|---|---|---|---|
36C24826R0028 0004.pdf | Apr 20, 2026 | ||
04 SC-100.pdf | Apr 16, 2026 | ||
SARGENT_10X_Line_Catalog.pdf | Apr 16, 2026 | ||
03 SD-100.pdf | Apr 16, 2026 | ||
VA Hydrant Inspection Report_out of date.pdf | Apr 16, 2026 | ||
S4100-1031.pdf | Apr 16, 2026 | ||
36C24826R0028 0003.pdf | Apr 16, 2026 | ||
06 SW-100.pdf | Apr 16, 2026 | ||
h6-a-dome-camera-datasheet.pdf | Apr 16, 2026 | ||
SARGENT_10X_Line_Sell_Sheet.pdf | Apr 16, 2026 | ||
fact_sheet_acc_7.pdf | Apr 16, 2026 | ||
00_CCG_MIAMI_VAMC_B44_IR_E1 30 X 42 - GRID-Key_Planning.pdf | Apr 16, 2026 | ||
014500a QC Form Attachment.pdf | Apr 16, 2026 | ||
RFIs Combined 546-23-105 SO.xlsx | XLSX | Apr 16, 2026 | |
013323a Submittal Register Form.pdf | Apr 16, 2026 | ||
avigilon-nvr6-form-d-fips- datasheet-en.pdf | Apr 16, 2026 | ||
avigilon-unity-h6a-h6x-bullet-camera-datasheet-en.pdf | Apr 16, 2026 | ||
36C24826R0028 0002.pdf | Apr 13, 2026 | ||
ATTACHMENT 1 - 100 Bid Final Design Constuction Specification Document 546-23-105 R1.pdf | Mar 6, 2026 | ||
36C24826R0028 0001.pdf | Mar 6, 2026 | ||
S02 - 36C24826R0028 - R1 - Final.pdf | Mar 6, 2026 | ||
ATTACHMENT 1 - 100 Bid Final Design Constuction Specification Document 546-23-105.pdf | Mar 3, 2026 | ||
ATTACHMENT 8 - EMR.pdf | Mar 3, 2026 | ||
ATTACHMENT 7 - Specialized Experience Form.pdf | Mar 3, 2026 | ||
ATTACHMENT 6 - Limitation of Subcontracting Certificate.docx | DOCX | Mar 3, 2026 | |
ATTACHMENT 5 - DBA Wage Determination FL20260215.pdf | Mar 3, 2026 | ||
ATTACHMENT 4 - GEO Tech Report.zip | ZIP | Mar 3, 2026 | |
ATTACHMENT - 3 100 Bid Drawings 546-23-105.zip | ZIP | Mar 3, 2026 | |
ATTACHMENT 2 - 100 CIH Report 546-23-105.zip | ZIP | Mar 3, 2026 | |
S02 - 36C24826R0028 - Final.pdf | Mar 3, 2026 | ||
ATTACHMENT 9 - Past Performance Questionnaire.docx | DOCX | Mar 3, 2026 |
Y1NB--FY26: (PROJ: 546-23-105) Create Redundancy Capacity in Chiller Plant System/ Chilled & Condensed Water System Repair/Replacement
Contact and place of performance
Aldwyn Singleton
FL 33125
USA
The contractor shall provide construction services in accordance with the Statement of Work for Project Number: 546-23-105 – Create Redundancy Capacity in Chiller Plant System. The primary objective of this project is to provide redundant capacity for the existing chilled and condenser water systems and their associated auxiliary systems. This includes adding a new water-cooled chiller, sized for 1,250 tons, on...
View moreThe Department of Veterans Affairs has issued solicitation 36C24826R0028 for construction services related to project 546-23-105, which aims to create redundancy and capacity in the chiller plant system at a facility in Florida. The primary objective is to provide redundant capacity for existing chilled and condenser water systems and their associated auxiliary systems. This work involves adding a new 1,250-ton water-cooled chiller on the second level of a building addition and installing a new two-cell cooling tower on the roof. The project also requires the installation of electrical gear on the third level and the preparation of the fourth level to house an electrical generator, which will be procured separately.
The contractor is responsible for site preparation, including the demolition and removal of existing structures, as well as furnishing all labor and materials required by the design specifications and statement of work. This project is classified under NAICS 236220, Commercial and Institutional Building Construction, and PSC Y1NB, Construction of Heating and Cooling Plants. The period of performance is established as 1,095 calendar days from the issuance of the notice to proceed.
The solicitation was published on March 3, 2026, with a response deadline of April 27, 2026. Aldwyn Singleton is the designated point of contact for this requirement. The solicitation includes 31 attachments containing technical drawings, catalogs, and inspection reports to guide the construction efforts. All work must be completed in accordance with the provided 100% design and narrative addendums.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.