TDA Auxiliary Water Supply Backup Debris Management
Contact and place of performance
David Cook
Lyle, WA 98635
USA
The U.S. Army Corps of Engineer (USACE) Portland District (NWP) intends to solicit construction firms who are interested in submitting a competitive firm-fixed-price bid for this project. This PRESOLICITATION notice for the The Dallas Lock and Dam (TDA) Auxiliary Water Supply Backup Debris Management. Project Background. The Dalles Lock & Dam is 192 miles from the mouth of the Columbia River near the city of...
View moreProject Scope. This project is a Design-Bid-Build construction requirement which will provide a predesigned mechanical method for dislodging debris from the trashracks at the EFL AWSB system intake. This will remove the need for operations staff to shut down the AWSB system to let river currents clear accumulated debris from the screens.
The predesigned AWSB Intake trashrack cleaning system is based on a telescoping boom mounted rotating bristle brush and includes the following:
Anticipated Construction Schedule: CENWP intends to advertise in late June/early July 2026 and award in September 2026. Construction Contract with estimated construction completion by the end of calendar year 2028.
Estimated Construction Cost (ECC): The current ECC is between $1,000,000.00 and $5,000,000.00.
Number and Type of Contracts: NWP contemplates awarding one (1), Firm Fixed-Price contract.
The acquisition strategy decision: 100% Small Business Set-Aside
Anticipated Source Selection Process: The expected method to determine the best value to the government is Invitation for Bid.
Bid Procedures: The solicitation will be posted on SAM.GOV website once it is issued.
Plans and Specifications: The Plans and Specifications will also be posted on beta.SAM.gov website once it is issued.
System for Award Management (SAM): Offerors must register in the SAM at: https://www.sam.gov/portal/public/SAM/ prior to submission of bids and prior to receiving an award.
Cybersecurity Maturity Model Certification (CMMC) level: The CMMC level anticipated for this requirement is CMMC Level 2 (Self). This CMMC level, or higher (see 32 CFR part 170), will be required prior to award and maintained for the duration of the contract for each contractor information system that will process, store, or transmit Federal contract information (FCI) or controlled unclassified information (CUI) during performance of the contract.
THIS PRE-SOLICITATION NOTICE IS FOR THE PURPOSE OF INFORMING INDUSTRY THAT THIS SOLICITATION WILL BE POSTED ON SAM.GOV IN LATE JUNE/EARLY JULY 2026. THIS NOTICE IS NOT AN INVITATION FOR BIDS, AND ANY BIDS RECEIVED AS A RESULT OF THIS PRE-SOLICITATION NOTICE WILL NOT BE ACCEPTED OR EVALUATED.
THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.
The U.S. Army Corps of Engineers Portland District intends to solicit a firm-fixed-price construction contract for the The Dalles Lock and Dam Auxiliary Water Supply Backup (AWSB) Debris Management project. This Design-Bid-Build requirement involves installing a mechanical method for dislodging debris from trashracks at the East Fish Ladder AWSB system intake in Lyle, Washington. The project scope includes a vendor-supplied telescoping boom-mounted rotating bristle brush system, fixed structural steel operator and maintenance platforms anchored to the intake wall, and pavement repairs for trenching. Electrical and data components involve routing power and conduits from the dam's service gallery to the intake and integrating machinery status and water level data into the plant’s Supervisory Control and Data Acquisition (SCADA) system.
This pre-solicitation notice, identified by solicitation number W9127N26BA019, is categorized under NAICS code 237990 for Other Heavy and Civil Engineering Construction and PSC Z2KZ for Repair or Alteration of Other Conservation and Development Facilities. The acquisition is designated as a 100% SBA Small Business Set-Aside. Interested firms must maintain a Cybersecurity Maturity Model Certification (CMMC) of Level 2 or higher for the duration of the contract. David Cook is the primary point of contact for this requirement.
The government anticipates advertising the solicitation in late June or early July 2026, with a response deadline of June 28, 2026. The contract is expected to be awarded in September 2026, with an estimated construction completion date by the end of calendar year 2028. The estimated construction cost for this project is between $1,000,000 and $5,000,000. Best value will be determined through an Invitation for Bid process.