Name | Type | Posted | Actions |
|---|---|---|---|
36C25026B0042 0002.docx | DOCX | Jun 5, 2026 | |
Atch RFI 4 Lead Paint Report.pdf | Jun 5, 2026 | ||
Atch RFI 6 life safety plan.pdf | Jun 5, 2026 | ||
Atch RFI 7 ACM SURVEY REPORT.pdf | Jun 5, 2026 | ||
36C25026B0042 0001.docx | DOCX | May 12, 2026 | |
36C25026B0042_1.pdf | May 12, 2026 | ||
Attachment 6 - EMR Form.docx | DOCX | May 12, 2026 | |
Attachment 7 - Request for Information.docx | DOCX | May 12, 2026 | |
Attachment 8 - ICRA.pdf | May 12, 2026 | ||
36C25026B0042_1.docx | DOCX | May 12, 2026 | |
Attachment 10 - FX Controls Redacted.pdf | May 12, 2026 | ||
Attachment 11 -Honeywell Siemens JCI Redacted.pdf | May 12, 2026 | ||
Attachment 12 - Tridium Niagara Redacted.pdf | May 12, 2026 | ||
Attachment 9 - PCRA.pdf | May 12, 2026 | ||
Attachment 1 - OH20260082 01022026.pdf | May 12, 2026 | ||
Attachment 2 - VHA Directive 1192.01.pdf | May 12, 2026 | ||
Attachment 3 - Specs.pdf | May 12, 2026 | ||
Attachment 4 - Drawings.pdf | May 12, 2026 | ||
Attachment 5 - VAAR 852.219-75.docx | DOCX | May 12, 2026 |
Z2DA--Replace Dual Duct Boxes on Second Floor - 539-21-201
Z2DA--Replace Dual Duct Boxes on Second Floor - 539-21-201
Z2DA--Replace Dual Duct Boxes on Second Floor - 539-21-201
Project 539-21-201 involves replacing dual duct mixing boxes on the second floor of the Cincinnati VA Medical Center. This firm-fixed-price construction project is a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside with an estimated value between $1,000,000 and $2,500,000. The scope includes mechanical removals, new HVAC installations, architectural modifications, and hazardous material abatement. The performance period is 365 calendar days. Work within hospital corridors is restricted to weekends between Friday at 8:00 PM and Monday at 6:00 AM. Technical requirements include Infection Control Risk Assessment (ICRA) Class III measures and the use of Tridium Facility Explorer (FX) brand-name controls. Amendment 0002 extended the bid opening date to June 16, 2026, and added site reports regarding lead-based paint and asbestos-containing materials. This project involves replacing dual duct mixing boxes on the second floor of the Cincinnati VAMC. It is a 100% SDVOSB set-aside with a budget range of $1,000,000 to $2,500,000. The work includes mechanical demolition, HVAC installation, and architectural repairs to achieve a Level 5 wall finish. The performance period is 365 days. The project involves replacing dual duct mixing boxes on the second floor of the Cincinnati VAMC. This firm-fixed-price contract, project 539-21-201, is valued between $1M and $2.5M. It is restricted to SDVOSBs and has a 365-day performance period.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Ronald T Heidemann
Not specified
REPLACE DUAL DUCT BOXES ON THE SECOND FLOOR FOR THE VETERANS AFFAIRS MEDICAL CENTER (VAMC) CINCINNATI, OH PROJECT NUMBER: 539-21-201 QUESTIONS AND ANSWERS (RFIs) TO REQUEST FOR INVITATION FOR BID (IFB) NUMBER: 36C25026B0042 QUESTIONS AND ANSWERS : RFI #1 Question: spec 01 00 00 lay down and dumpster area: Where will the laydown and dumpsters area be located? Answer: There is no guarantee of laydown space, contractors...