Name | Type | Posted | Actions |
|---|---|---|---|
Tech Questions Tracker - Tuskegee EHRM 6.5.2026.pdf | Jun 5, 2026 | ||
36C77626R0043 0005.pdf | Jun 5, 2026 | ||
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 1 E.pdf | Jun 2, 2026 | ||
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 1 D.pdf | Jun 2, 2026 | ||
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 1 C.pdf | Jun 2, 2026 | ||
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 1 B.pdf | Jun 2, 2026 | ||
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 1 A.pdf | Jun 2, 2026 | ||
36C77626R0043 Amendment 0004.pdf | Jun 2, 2026 | ||
36C77626R0043 Amendment 0003.pdf | Jun 1, 2026 | ||
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 2.pdf | Jun 1, 2026 | ||
Addendum 1 - Narrative.pdf | Jun 1, 2026 | ||
Tech Questions Tracker - Tuskegee EHRM 6-1-26.pdf | Jun 1, 2026 | ||
EHRM Addendum 01 5-26-26 - REVISED Drawings Vol 3.pdf | Jun 1, 2026 | ||
36C77626R0043 Amendment 0002.pdf | May 18, 2026 | ||
36C77626R0043 Amendment 0001.pdf | May 5, 2026 | ||
Site Visit Sign-in Sheet - Tuskegee EHRM.pdf | May 5, 2026 | ||
RFP Attachment 1 - DBA Rates - Macon County - 1-2-26.pdf | Apr 20, 2026 | ||
RFP Attachment 17 - PPQ.docx | DOCX | Apr 20, 2026 | |
RFP 36C77626R0043.pdf | Apr 20, 2026 | ||
RFP Attachment 16 - Project Information Sheet for Contractors.docx | DOCX | Apr 20, 2026 | |
RFP Attachment 15 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 3 - 12-1-25.pdf | Apr 20, 2026 | ||
RFP Attachment 14 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 2 - 12-1-25.pdf | Apr 20, 2026 | ||
RFP Attachment 13 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 7 - 12-1-25.pdf | Apr 20, 2026 | ||
RFP Attachment 12 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 6 - 12-1-25.pdf | Apr 20, 2026 | ||
RFP Attachment 11 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 5 - 12-1-25.pdf | Apr 20, 2026 | ||
RFP Attachment 10 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 4 - 12-1-25.pdf | Apr 20, 2026 | ||
RFP Attachment 9 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 3 - 12-1-25.pdf | Apr 20, 2026 | ||
RFP Attachment 8 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 2 - 12-1-25.pdf | Apr 20, 2026 | ||
RFP Attachment 7 - EHRM Infra Upgrades - Tuskeegee - Drawings Vol 1 Pt 1 - 12-1-25.pdf | Apr 20, 2026 | ||
RFP Attachment 6 - Specifications Vol 2 of 2 - 619A4-22-700 - Tuskegee EHRM.pdf | Apr 20, 2026 | ||
RFP Attachment 5 - Specifications Vol 1 of 2 - 619A4-22-700 - Tuskegee EHRM.pdf | Apr 20, 2026 | ||
RFP Attachment 4 - Limitations on Subcontracting - Tuskegee.docx | DOCX | Apr 20, 2026 | |
RFP Attachment 3 - VAAR Security Language.pdf | Apr 20, 2026 | ||
RFP Attachment 2 - Site Visit - Tuskegee.pdf | Apr 20, 2026 |
Z2DA--619A4-22-700 EHRM Infrastructure Upgrades Tuskegee Construction
The Department of Veterans Affairs is soliciting proposals for the EHRM Infrastructure Upgrades construction project at the Tuskegee VA Medical Center in Alabama. This procurement, issued as a 100% Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside under solicitation 36C77626R0043, involves comprehensive general construction and infrastructure improvements to support Electronic Health Record Modernization. The scope of work includes electrical, HVAC, and fiber infrastructure upgrades across multiple campus buildings, with an estimated project magnitude between $20,000,000 and $50,000,000. The solicitation package includes a base Request for Proposal (RFP) supported by extensive technical specifications and three volumes of architectural and engineering drawings. Since the initial release, the government has issued three formal amendments that extend the proposal deadline, incorporate a technical questions tracking sheet, and provide revised drawing sets for Volumes 2 and 3. These revisions introduce critical updates to Infection Control Risk Assessment (ICRA) protocols and technical narratives for technology and mechanical modifications. Proposals are due by June 15, 2026, at 12:00 PM EDT. The evaluation will follow a best-value tradeoff process where past performance is considered significantly more important than price. The project has a defined period of performance of 911 calendar days from the notice to proceed, and the successful contractor must perform at least 15% of the work as required by the limitations on subcontracting for general construction. This project is a 100% SDVOSB set-aside for infrastructure upgrades at the Tuskegee VA Medical Center. Three amendments have been issued to date, extending the proposal deadline and incorporating tech…
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.
Contact and place of performance
Bailey Donato
Tuskegee, AL 36083
USA
RFP 36C77626R0043
Project 619A-22-700, EHRM Infrastructure Upgrades at the Tuskegee VA Medical Center (VAMC) located in Tuskegee, AL
Amendment 0001 issued 5-5-2026
Amendment 0002 issued 5-18-2026
Amendment 0003 issued 6-1-2026
Amendment 0004 issued 6-2-2026
Amendment 0005 issued 6-5-2026