Name | Type | Posted | Actions |
|---|---|---|---|
Solicitation Amendment FA441725R00170003 SF 30.pdf | Jul 30, 2025 | ||
Solicitation Amendment - FA441725R00170003.pdf | Jul 30, 2025 | ||
Rev. 7_30_25_Attachment 7 - Section L Instructions to Offerors - HVAC MACC.pdf | Jul 30, 2025 | ||
Attachment 13 - B90131 Controls Drawings Specific to CRAC Units.pdf | Jul 29, 2025 | ||
Attachment 12 - B90131 Updates to Building Drawings (2015).pdf | Jul 29, 2025 | ||
Attachment 10 - 7.29_RFI Final - FA441725R0017 - Hurlburt HVAC MACC.pdf | Jul 29, 2025 | ||
Rev. 7_23_25_Attachment 8 - Section M Evaluation Factors for Award.pdf | Jul 29, 2025 | ||
Rev. 7_23_25_Attachment 7 - Section L Instructions to Offerors - HVAC MACC.pdf | Jul 29, 2025 | ||
Amendment FA441725R00170002 SF 30.pdf | Jul 29, 2025 | ||
Attachment 15 - Bldg 90131 Asbestos Sampling 22-Jun-22.pdf | Jul 29, 2025 | ||
Attachment 14 - ACM_LBP Survey Bldg 90131_1 Mar 2024_FTEV201009_Repair_Renovation.pdf | Jul 29, 2025 | ||
Amendment - FA441725R00170002.pdf | Jul 29, 2025 | ||
Solicitation Amendment FA441725R00170001 SF 30.pdf | Jul 11, 2025 | ||
Site Visit Brief.pdf | Jul 10, 2025 | ||
B90131 Site Visit Sign -In _Redacted.pdf | Jul 10, 2025 | ||
4d Mechanical Drawing Seed Project.pdf | Jun 26, 2025 | ||
4e Air Unit Schedules B90131.pdf | Jun 26, 2025 | ||
Attachment 9 - Section H Special Contract Requirements.pdf | Jun 26, 2025 | ||
Attachment 8 - Section M Evaluation Factors for Award.pdf | Jun 26, 2025 | ||
Attachment 6 - Financial Worksheet.docx | DOCX | Jun 26, 2025 | |
Attachment 3 - Wage Determination FL20250217.pdf | Jun 26, 2025 | ||
Attach 4g - 50 Division Construction Cost Estimate Worksheet.xlsx | XLSX | Jun 26, 2025 | |
Attachment 2 - HF HVAC-MACC Ordering Guide.pdf | Jun 26, 2025 | ||
Solicitation - FA441725R0017.pdf | Jun 26, 2025 | ||
4c Existing Equipment.pdf | Jun 26, 2025 | ||
4b WTA _SEED project.pdf | Jun 26, 2025 | ||
Attachment 1- Hurlburt HVAC MACC SOW.pdf | Jun 26, 2025 | ||
Attachment 5 - PPQ.docx | DOCX | Jun 26, 2025 | |
4f Equipment Specs B90131 - OR EQUAL.pdf | Jun 26, 2025 | ||
4a SOW Replace - Upgrade CRAC Units B90131 - 03-March-2025.pdf | Jun 26, 2025 | ||
Attachment 7 - Section L Instructions to Offerors - HVAC MACC.pdf | Jun 26, 2025 |
Hurlburt Field HVAC MACC
Contact and place of performance
Ms. Erica Eberle
Hurlburt Field, FL 32544
USA
****UPDATE 30 July 2025 - Solicitation Amendment 0003 posted. Amendment updates Attachment 7 Section L Instructions to Offerors, paragraph 2.1.4.3. *** UPDATE 29 JULY 2025 - Solicitation Amendment 0002 posted. Amendment changes response date from 31 July to 7 August 2025 at 1300 hrs CDT (local). Amendment also updates Section J Attachments to include pre-proposal site visit RFIs and responses - Attachment 10, Site Ph...
View moreThe Department of the Air Force, specifically the 1 SOCONS at Hurlburt Field, Florida, has issued solicitation FA441725R0017 for a Heating, Ventilation, and Air Conditioning (HVAC) Multiple Award Construction Contract (MACC). This requirement is a total Small Business Set-Aside (SBA) designated under NAICS 238220, Plumbing, Heating, and Air-Conditioning Contractors, and PSC N041, Installation of Equipment- Refrigeration, Air Conditioning, and Air Circulating Equipment. The contract serves as an Indefinite-Delivery, Indefinite-Quantity (IDIQ) vehicle to supplement Hurlburt Field’s Civil Engineer in-house capability for HVAC repair, alteration, and replacement work. The scope includes demolition, site work, electrical, mechanical, and design services for HVAC systems across various facilities at Hurlburt Field, Florida.
The government intends to award approximately five contracts to establish a pool of contractors who will compete for individual task orders ranging from $1,000 to $3,000,000. The total combined ceiling for all contracts is $25,000,000 over a five-year ordering period. Due to the urgent nature of the requirements, prospective contractors must have a home or affiliated office located within a 300-mile radius of Hurlburt Field. Selection will utilize Trade-Off Source Selection Procedures to determine best value based on evaluations of proposals. Minimum bonding requirements are set at $1,000 for single projects and $5,000,000 in the aggregate.
Responses to the solicitation are due by August 7, 2025. The notice includes 31 attachments, such as solicitation amendments, Section L instructions, Section M evaluation criteria, and site visit RFI responses. Prospective contractors must be registered in the System for Award Management and possess a current NIST SP 800-171 assessment in the Supplier Performance Risk System. Ms. Erica Eberle serves as the point of contact for this acquisition.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.