Name | Type | Posted | Actions |
|---|---|---|---|
36C26326B0035.pdf | May 14, 2026 |
656-12-222 Replace Windows Bldg 4, 8 & 9
Contact and place of performance
Dwayne Brauch
Saint Cloud, MN 56303
USA
The Contractor shall furnish all labor, materials, tools and equipment required to repair, remove, replace and completely refurbish all windows in Buildings 4,8 and 9. The contractor shall remove the existing internal and external window trim and wall finishes in order to successfully gain access to and cut out the existing wood windows. Incorporated into the demolition of the windows will be the safe removal of both...
View moreWork includes, but is not limited to:
No VA furnished equipment
New construction consists of but is not limited to windows, doors, general construction and abatement.
Contractor is responsible for the movement, adjustment and storage of all furnishings disturbed during construction.
Contract working hours are 8 am to 4:30 pm Monday through Friday, excluding Federal Holidays. Weekend and night work may be necessary in sensitive areas and shall be approved by the COR.
Phasing will be as listed on the contract documents
The period of performance for this work is four hundred fifteen (415) calendar days from issuance of Notice to Proceed (NTP). There is a 60-day window after the Post Award Conference and prior to the Notice to Proceed for badging-related submission and processing. No additional expense will be allowed regarding badging items henceforth.
The Department of Veterans Affairs has issued a pre-solicitation notice under solicitation number 36C26326B0035 for the replacement of windows at the Veterans Affairs Health Care System in Saint Cloud, Minnesota. This procurement is set aside for SDVOSBS SDVOSBS and is classified under NAICS 238350 Finish Carpentry Contractors and PSC Y1AA CONSTRUCTION OF OFFICE BUILDINGS. The contractor must furnish all labor, materials, tools, and equipment required to repair, remove, replace, and completely refurbish all windows within Buildings 4, 8, and 9.
The scope of work includes the demolition of internal and external window trim and wall finishes to access and remove existing wood windows, alongside the remediation of lead and asbestos-containing materials. New construction consists of installing window frames, sashes, screens, storm windows, and doors, followed by the restoration of walls, ceilings, and millwork. Work will be performed in occupied buildings behind construction barriers, and the contractor is responsible for moving and storing any furnishings disturbed during the project.
The period of performance is 415 calendar days from the issuance of the Notice to Proceed, with a 60-day window prior to the notice for badging-related submissions. Standard working hours are 8:00 am to 4:30 pm, Monday through Friday, though weekend or night work may be required in sensitive areas. Responses are due by June 8, 2026, to the point of contact Dwayne Brauch. One attachment, a PDF file titled 36C26326B0035.pdf, was published with the notice on May 14, 2026.
Generated by Lumen AI