Name | Type | Posted | Actions |
|---|---|---|---|
Contractor_Questions_for_RFP_W56HZV19R0005_-_Parachute_Items.docx | DOCX | Jul 29, 2019 | |
W56HZV19R0005.pdf | Jul 24, 2019 | ||
W56HZV19R0005-0003.pdf | Jul 24, 2019 | ||
W56HZV-19-R-0005-0002.pdf | Jul 18, 2019 | ||
W56HZV19R0005-0001.pdf | Jul 3, 2019 | ||
Attachment_0002_-_Section_D_Packaging_Requirements_RA-1_Parachute_Items.pdf | Jun 18, 2019 | ||
Attachment_0005_-_TDPLs_RA-1_Parachute_Items.pdf | Jun 18, 2019 | ||
Attachment_0004_-_DOD_Detail_Spec_Parachutes_Personnel_MIL-DTL-6645J.pdf | Jun 18, 2019 | ||
Attachment_0003_-_Qualified_Product_List_(QPL)_MIL-DTL-6645.pdf | Jun 18, 2019 | ||
Attachment_0006_-_First_Article_Waiver_Worksheet.pdf | Jun 18, 2019 | ||
Attachment_0001_-_RA-1_Parachute_Items_Years_1-5.xlsx | XLSX | Jun 18, 2019 |
Contractor Questions for RFP W56HZV-19-R-0005 (RA-1 Parachute System Items)
Contact and place of performance
Daniel C. Poehling
Not specified
Contractor Questions for RFP W56HZV-19-R-0005 (RA-1 Parachute System Items) 1. Could you clarify Production time allowed for Products with FAT? 150 Days with FAT Using the following assumptions: Section I - 102 FAR 52.209-3 First 90 days (30 Day notification to US GOV for Test Date and Production.) After the First Article Test US GOV can take up to 45 Days to Approve. 90 Days + 45 Days = 135 Leaves 15 Days for produc...
View moreThe US Army Corps of Engineers is seeking RA-1 parachute system items through solicitation W56HZV19R0005. This combined synopsis/solicitation falls under NAICS code 314999, All Other Miscellaneous Textile Product Mills, and PSC code 16. The procurement utilizes a five-year contract structure with a minimum guaranteed quantity for each item to be ordered via Delivery Order One in the first year. The maximum contract quantity for the five-year period includes these initial guaranteed amounts.
The delivery schedule for items requiring a First Article Test (FAT) is structured around specific milestones: 60 days for the FAT report, 30 days for Government approval, and subsequent windows of 60, 120, or 150 days for the first production delivery depending on the item. While FAT pricing is not separately listed in Section B, it is incorporated into the total cost of the specific item on the initial delivery order if the test is not waived. First Article samples that are not consumed or destroyed during testing may be included in the first-year product quantity, except for the D-Bag.
Responses for this opportunity are due by July 31, 2019. The solicitation and its amendments, totaling 11 attachments, address contractor inquiries regarding technical data package distribution, production ramp-up, and alternate delivery schedules. Documentation includes packaging requirements and various solicitation amendments published between June and July 2019. Points of contact for this requirement are managed by Daniel C. Poehling.