Shenango River Lake Ranger Station Building Siding Replacement
Contact and place of performance
Mario TAORMINA
16154
The U.S. Army Corps of Engineers, Pittsburgh District, has a need for a Commercial Construction Contract for Siding Replacement at the Shenango River Lake Ranger Station Building in Transfer, Mercer County, Pennsylvania. The scope of work requires the contractor to furnish all labor, materials, and equipment for the complete replacement of the exterior siding system on the Shenango Ranger Station. This includes the d...
View moreThe U.S. Army Corps of Engineers, Pittsburgh District, issued solicitation W911WN26QA022 for the replacement of the exterior siding system at the Shenango River Lake Ranger Station Building in Transfer, Pennsylvania. This procurement is a 100% small business set-aside (SBA) classified under NAICS code 238170, Siding Contractors, and PSC Y1QA, Construction of Restoration of Real Property (Public or Private). The government intends to award a single firm-fixed-price purchase order following a request for quote process conducted through the Procurement Integrated Enterprise Environment. Responses are due by March 20, 2026.
The contractor must provide all labor, equipment, and materials to demolish and dispose of existing cedar siding, insulation, and furring boards. The scope of work includes installing pressure-treated lumber furring strips, rigid insulation, and approximately 2,500 square feet of lap cement fiberboard siding. Additional requirements involve installing new prefinished aluminum coverings for window and door openings, replacing cedar soffits with cement board on the porch ceiling, and installing aluminum gravel stops, flashing, and a new gutter system. The contractor is also responsible for the temporary relocation and reinstallation of exterior utilities and fixtures to maintain essential services during construction.
The project schedule requires all work to be completed within 120 calendar days after the issuance of a written notice to proceed. Administrative records for this solicitation include two attachments: a site visit sign-in sheet from March 5, 2026, and the original solicitation documentation. Amendment 0001 was issued to modify RFQ and DFARS class deviation provisions and clauses. Mario Taormina serves as the point of contact for this requirement.