Name | Type | Posted | Actions |
|---|---|---|---|
https://dodprocurementtoolbox.com/ | LINK | May 30, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | May 30, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | May 30, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=FA527025R0022¬iceType=SolicitationNotice | LINK | May 30, 2025 |
Repair Cracks and Spalling B43424
Contact and place of performance
Leona Cantu
96368
Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to stabilize structural columns with jacketing procedure and fill gaps between concrete and wall interfaces. Replace all the plumbing items under the slab, fire suppression system, fire alarm system and jammed doors. Install ceiling tiles and suspension system as determined by the construction planning stage. Apply Fiber R...
View moreThe Department of the Air Force, 18 CONS PK, issued solicitation FA527025R0022 for the repair of cracks and spalling at Building 43424. The project involves repairing concrete walls, beams, columns, roof, floor slabs, and eaves, along with stabilizing structural columns through a jacketing procedure. Work is classified under NAICS 236220 Commercial and Institutional Building Construction and PSC Z2EA REPAIR OR ALTERATION OF AMMUNITION FACILITIES.
The scope of work includes replacing sub-slab plumbing, fire suppression systems, fire alarm systems, and jammed doors. Contractors are required to install ceiling tiles and suspension systems, apply Fiber Reinforced Polymer to canopy beams, and replace electrical fixtures as needed to facilitate repairs. The project involves the abatement and disposal of asbestos-containing material and lead-based paint, as well as the demolition of waste materials. All design and construction activities must integrate sustainable principles and life cycle cost-effective practices according to UFC 1-200-02.
A site visit is scheduled for June 12, 2025, at 09:00 Japan Standard Time (JST), with reservation forms due by June 9, 2025. Requests for information must be submitted by June 20, 2025. Final proposals are due to the point of contact, Leona Cantu, no later than 14:30 JST on July 1, 2025. While metadata indicates zero current attachments, the solicitation instructions reference required forms for site visits and proposal submission.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.