Name | Type | Posted | Actions |
|---|---|---|---|
1240LT26Q0053_A0004.pdf | May 19, 2026 | ||
M2215045 - USFS Northern Hills Office Geotechnical-Revised.pdf | May 18, 2026 | ||
1240LT26Q0053_A0003.pdf | May 18, 2026 | ||
1240LT26Q0053_A0002.pdf | May 14, 2026 | ||
1240LT26Q0053_A0001.pdf | Apr 22, 2026 | ||
Attachment 5 - DBA Wage Determination Lawrence County.pdf | Apr 21, 2026 | ||
Combined Synopsis_1240LT26Q0053.pdf | Apr 21, 2026 | ||
Attachment 4 - Specifications 4.8.2026.pdf | Apr 21, 2026 | ||
Attachment 3 - Drawings Signed 100 percent N Hills Ranger Parking Lot.pdf | Apr 21, 2026 | ||
Attachment 2 - Schedule of Items 4.8.2026.xlsx | XLSX | Apr 21, 2026 | |
Attachment 1 - Statement of Work _3.27.2026.pdf | Apr 21, 2026 |
Northern Hills Ranger District Parking Lot Reconstruction, Spearfish, South Dakota
Contact and place of performance
Holly Hlavac
Spearfish, SD 57783
USA
ATTENTION: AMENDMENT 1240LT26Q0053_A0004 TO THE SOLICITATION HAS BEEN RELEASED. SEE ATTACHMENTS/LINKS FOR AMENDMENT 0004 Project Title: Northern Hills Ranger District Parking Lot Reconstruction, Spearfish, South Dakota Description - This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation....
View moreSite Visit: A site visit will be conducted on May 6, 2026, at 1:00 PM MST, see Solicitation for details.
PSC Code: YlLZ - Construction of Parking Facilities
NAICS Code: 237310 - Highway, Street, and Bridge Construction
Size Standard: $45M
Project Magnitude: $1,000,000 and $5,000,000
The United States Forest Service, specifically the USDA-FS CSA Intermountain 8 office, has issued Request for Quotation (RFQ) 1240LT26Q0053 for the reconstruction of the Northern Hills Ranger District parking lot in Spearfish, South Dakota. This combined synopsis/solicitation is set aside for SBA Small Business Administration (SBA) concerns under NAICS code 237310 Highway, Street, and Bridge Construction and PSC code Y1LZ Construction of Parking Facilities. The project magnitude is estimated between $1,000,000 and $5,000,000.
The scope of work involves addressing structural, grade, and drainage issues at a facility currently impacted by poor sub-base construction and clay-rich soil. To improve public health, safety, and access, the contractor will reconstruct the parking lot using proper base materials, regrade the site, and install drainage systems. Additional requirements include adding sidewalks and designated walking areas, improving accessible parking, and enhancing site lighting. Over 65 percent of the existing lot exhibits alligator cracking and structural instability caused by water infiltration and freeze-thaw cycles.
Responses to this solicitation are due by June 4, 2026. A site visit is scheduled for May 6, 2026, at the performance location in Spearfish. Primary contact for this requirement is Holly Hlavac. The solicitation documentation includes 11 attachments, featuring multiple amendments, a geotechnical report, and a Davis-Bacon Act wage determination for Lawrence County.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.