Name | Type | Posted | Actions |
|---|---|---|---|
C1_Fort Polk ITAM Bid Abstract.pdf | Apr 7, 2020 | ||
B3_Amendment 4.pdf | Mar 23, 2020 | ||
B3_Amendment 3.pdf | Mar 12, 2020 | ||
B3_Amendment 2.pdf | Mar 5, 2020 | ||
B3_Amendment 1.pdf | Feb 27, 2020 | ||
Drawings.PDF | Feb 7, 2020 | ||
B3_W9126G20B0027.pdf | Feb 7, 2020 |
WOSB $15M Fort Polk ITAM SATOC
Contact and place of performance
Paige E Stone
Fort Polk, LA
USA
BID ABSTRACT posted 06 April 2020, see attachment "C1_Fort Polk ITAM Bid Abstract" AMENDMENT 4 posted 23 March 2020, Bid Opening extended to 06 April, see attachment, "B3_Amendment 4". AMENDMENT 3 posted 12 March 2020, Bid Opening extended to 24 March, see attachment "B3_Amendment 3". AMENDMENT 2 posted 05 March 2020, Bid Opening extended to 17 March 2020, see attachment "B3_Amendment 2" AMENDMENT1 posted on 27 Febru...
View moreThe Department of the Army, U.S. Army Corps of Engineers (USACE) Fort Worth District, issued this Invitation for Bid (IFB) solicitation for Integrated Training Area Management (ITAM) services at Fort Polk, Louisiana. This procurement is a 100% Women-Owned Small Business (WOSB) set-aside under solicitation number W9126G20B0027. The project falls under NAICS code 237990, Other Heavy and Civil Engineering Construction, and PSC Y1AZ, Construction of Other Administrative Facilities and Service Buildings. The government intends to award a single firm-fixed-price Single Award Task Order Contract (SATOC) with a total capacity of $15 million. The performance period consists of a 12-month base period and up to four 12-month option periods, for a maximum duration of 60 months.
The contractor must provide all labor, materials, and equipment required for site preparation construction services. Scope requirements include erosion, sediment, and pollution control; construction surveys; site investigation; and the installation of aggregate courses, articulated concrete block systems, and geocell systems. Additional tasks involve earth fill, hauling, seeding, excavation, clearing and grubbing, heavy mowing, and the installation of reinforced concrete culvert pipes and silt fences. Timber management activities, such as felling and bunching, are also required.
This procurement was conducted via sealed bidding, with responses due by the final deadline of April 6, 2020. The solicitation was updated through four amendments, which primarily extended the bid opening date. Seven total attachments were provided, including drawings, the bid abstract, and multiple amendments. Paige E. Stone served as the primary point of contact for the submission of bids. All offerors were required to be registered in the System for Award Management (SAM) prior to receiving an award.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.