Name | Type | Posted | Actions |
|---|---|---|---|
W911KB25R0019 AM0009.pdf | Jul 14, 2025 | ||
W911KB25R0019 AM0008.pdf | May 23, 2025 | ||
SAM W911KB25R0019 AM0007.pdf | May 13, 2025 | ||
W911KB25R0019 AM0006.pdf | May 6, 2025 | ||
W911KB25R0019 AM0005.pdf | May 1, 2025 | ||
W911KB25R0019 AM0004.pdf | Apr 29, 2025 | ||
W911KB25R0019 AM0002.pdf | Apr 29, 2025 | ||
W911KB25R0019 AM0003.pdf | Apr 29, 2025 | ||
W911KB25R0019 AM0001.pdf | Mar 28, 2025 | ||
https://dodprocurementtoolbox.com/ | LINK | Mar 19, 2025 | |
https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W911KB25R0019 | LINK | Mar 19, 2025 | |
https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml | LINK | Mar 19, 2025 | |
https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf | LINK | Mar 19, 2025 |
FTG257 MISSILE FIELD 2 POWER REDUNDANCY
Contact and place of performance
Brittney Morrison
Not specified
This is a Request for Proposal (RFP) for a standalone 8(a) competitive contract. The purpose of the project is to provide electrical power redundancy to the Missile Field 2 silo interface vaults by adding Automatic Transfer Switches and Main Lug Only distribution panels with Molded Case Circuit Breakers. The SUS A and B switchgear will be physically separated, have enhanced coordination/protection features incorporat...
View moreThe Department of the Army, via the U.S. Army Corps of Engineers Alaska District, is issuing solicitation W911KB25R0019 for the installation of electrical power redundancy at Missile Field 2. This project is classified under NAICS 237130 for Power and Communication Line and Related Structures Construction and PSC Y1BF for Construction of Missile System Facilities. The procurement is conducted as a competitive 8A set-aside, with proposals due by July 16, 2025.
The scope of work for this standalone contract involves providing power redundancy to silo interface vaults through the addition of Automatic Transfer Switches and Main Lug Only distribution panels with Molded Case Circuit Breakers. The project requires the physical separation of SUS A and B switchgear and the incorporation of enhanced coordination and protection features. Additionally, the existing configuration will be converted from a Main-Tie-Main to a Main Tie-Tie-Main setup, and the Power Control and Monitoring System and Power Quality Monitoring System will be extended to the missile field.
Brittney Morrison is the point of contact for this solicitation, which includes nine total attachments featuring amendments through AM0009. The administrative record includes various updates and supplemental documents posted between March and July 2025. To obtain copies of the solicitation and its amendments, interested parties are directed to email the identified agency contacts.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.