Name | Type | Posted | Actions |
|---|---|---|---|
CHARLES_RFP_Amendment_6.pdf | Jun 14, 2022 | ||
Attachment L-4 CHARLES EPM Version M - (Amendment 5).xlsx | XLSX | Jun 10, 2022 | |
CHARLES_RFP_Amendment_5_A.pdf | Jun 10, 2022 | ||
CHARLES_RFP_Amendment_4.pdf | Jun 3, 2022 | ||
CHARLES_RFP_Amendment_3.pdf | Jun 2, 2022 | ||
Attachment L-4 CHARLES EPM Version K - (Amendment 3).xlsx | XLSX | Jun 2, 2022 | |
Attachment L-1 CHARLES Resource Planning Document - (Amendment 3).pptx | PPTX | Jun 2, 2022 | |
CHARLES Composite Incumbent Rates (Amendment 2).pdf | May 19, 2022 | ||
CHARLES_RFP_Amendment_2.pdf | May 19, 2022 | ||
Attachment L-2-2 Joint Venture Past Performance Matrix (Amendment 2).xlsx | XLSX | May 19, 2022 | |
Attachment L-2-1 Prime and Subcontractor Past Performance Matrix (Amendment 2).xlsx | XLSX | May 19, 2022 | |
Attachment L-1 CHARLES Resource Planning Document - (Amendment 2).pptx | PPTX | May 19, 2022 | |
CHARLES RFP Amendment 1.pdf | May 6, 2022 | ||
Attachment L-3 Past Performance Questionaire.pdf | Apr 29, 2022 | ||
Attachment L-2-3 Past Performance Narrative.pdf | Apr 29, 2022 | ||
Attachment L-2-2 Joint Venture Past Performance Matrix.xlsx | XLSX | Apr 29, 2022 | |
Attachment L-2-1 Prime and Subcontractor Past Performance Matrix.xlsx | XLSX | Apr 29, 2022 | |
Attachment L-1-1 TA2 Resources.pptx | PPTX | Apr 29, 2022 | |
Attachment L-1 CHARLES Resource Planning Document.pptx | PPTX | Apr 29, 2022 | |
J-3-6 LaRC Property List.pdf | Apr 29, 2022 | ||
J-3-5 Attachment JSC NASA IAM Listing.pdf | Apr 29, 2022 | ||
J-3-4 Attachment NAMIS Item Master Report.pdf | Apr 29, 2022 | ||
J-3-3 Attachment JSC Life Support Asset Listing.pdf | Apr 29, 2022 | ||
J-3-2 Attachment JSC Calibration Items.pdf | Apr 29, 2022 | ||
J-3-1 Attachment JSC Support Equipment Assets.pdf | Apr 29, 2022 | ||
SGT_Brakes.pdf | Apr 29, 2022 | ||
JSC-Superflex.pdf | Apr 29, 2022 | ||
JSCExpectedBehaviorsPoster.pdf | Apr 29, 2022 | ||
Foundations of Flight Operations.pdf | Apr 29, 2022 | ||
AOD09295v5_GV_CUI.pdf | Apr 29, 2022 | ||
AOD09295v4_SGT_CUI.pdf | Apr 29, 2022 | ||
AOD09295v3_GIII_CUI.pdf | Apr 29, 2022 | ||
AOD09295v2_WB57_CUI.pdf | Apr 29, 2022 | ||
AOD09295v1_T38_CUI.pdf | Apr 29, 2022 | ||
JPR8550.1.pdf | Apr 29, 2022 | ||
JPR8000.4.pdf | Apr 29, 2022 | ||
JPR1710.13.pdf | Apr 29, 2022 | ||
JPR1700.1.pdf | Apr 29, 2022 | ||
JPR1600.3.pdf | Apr 29, 2022 | ||
JPR1281.15.pdf | Apr 29, 2022 | ||
JPR1281.14.pdf | Apr 29, 2022 | ||
JPR1281.9B.pdf | Apr 29, 2022 | ||
Attachment L-6 SF1408-14e Pre-award Survey of Prospective Contractor Accounting System.pdf | Apr 29, 2022 | ||
AOD34101_QualityAssuranceProgram_CUI.pdf | Apr 29, 2022 | ||
AOD34100_MaintenanceManual_CUI.pdf | Apr 29, 2022 | ||
AOD33925_Opeartions_Duty_Officer_Instructions_CUI.pdf | Apr 29, 2022 | ||
AOD33872_Operational_Readiness_Review_CUI.pdf | Apr 29, 2022 | ||
AOD33842_EngineeringWorkOrder_CUI.pdf | Apr 29, 2022 | ||
AOD33840_FlightReadinessReview_CUI.pdf | Apr 29, 2022 | ||
AOD33820_EngineeringProjects_CUI.pdf | Apr 29, 2022 | ||
AOD09295v7_UAV_CUI.pdf | Apr 29, 2022 | ||
CHARLES RFP.pdf | Apr 29, 2022 | ||
JWI1040.27.pdf | Apr 29, 2022 | ||
CHARLES Questions RFP Form.pdf | Apr 29, 2022 | ||
CHARLES_Revisions from DRFP to RFP List.pdf | Apr 29, 2022 | ||
JPR1280.2.pdf | Apr 29, 2022 | ||
J-3-7 Attachment WFF Property List (Code 830 Inventory Final 2022-01-07) Too Large.pdf | Apr 29, 2022 | ||
Attachment L-4 CHARLES EPM.xlsx | XLSX | Apr 29, 2022 | |
JWI2190.1.pdf | Apr 29, 2022 | ||
AOD34102_NAMISMaintenanceProcessStandards_CUI.pdf | Apr 29, 2022 | ||
CHARLES_DRFP_Questions_and_Responses.pdf | Apr 29, 2022 | ||
Attachment L-5 Past Performance Consent Letter.pdf | Apr 29, 2022 | ||
CHARLES Website | LINK | Apr 29, 2022 | |
FOD VIDEO LINK.pdf | Apr 29, 2022 | ||
FOD 5 year goals .pdf | Apr 29, 2022 | ||
JWI6050.1.pdf | Apr 29, 2022 | ||
JWI4300.1.pdf | Apr 29, 2022 | ||
JWI4200.1.pdf | Apr 29, 2022 |
CompreHensive Aircraft Readiness, Lifecycle, Engineering, and Support (CHARLES)
Contact and place of performance
—
Not specified
No narrative description provided for this notice.
Solicitation 80JSC022R0014, titled CompreHensive Aircraft Readiness, Lifecycle, Engineering, and Support (CHARLES), is a federal opportunity concerning aviation engineering and aircraft operational readiness. The requirement involves lifecycle management and support services for aircraft systems as indicated by the program title.
The notice was originally published on April 12, 2022, and was last updated on December 6, 2022. The record includes 68 attachments documenting the procurement process, including six formal amendments to the Request for Proposal and multiple versions of the Electronic Pricing Model. These documents include various PDF and Excel files updated through June 2022.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.