Name | Type | Posted | Actions |
|---|---|---|---|
Attachment 17 - Teaming Experience Matrix (Rev. Aug 2021).pdf | Aug 23, 2021 | ||
Attachment 13 - DB Experience Project Reference_Aug2021.pdf | Aug 21, 2021 | ||
Attachment 1 - SOW Dated (Rev 20 Aug 2021).pdf | Aug 21, 2021 | ||
FA301621R00170001 SF 30.pdf | Aug 21, 2021 | ||
FA301621R00170001 - Conformed Solicitation.pdf | Aug 21, 2021 | ||
Attachment 15 - Quality and Satisfaction Survey_Aug2021.pdf | Aug 21, 2021 | ||
Attachment 19 - Section M Evaluation Factors for Award_Rev 20Aug2021.docx | DOCX | Aug 21, 2021 | |
Attachment 18 - Section L Instructions to Offerors _Rev20Aug2021.docx | DOCX | Aug 21, 2021 | |
Attachment 16 - Past Performance Information Sheet_Aug2021.pdf | Aug 21, 2021 | ||
QA Session for FA301621R0017_08202021.pdf | Aug 21, 2021 | ||
Attachment 6 - Contract Progress Report (AF 3065).pdf | Jul 21, 2021 | ||
Attachment 5 - RFI Template V2.pdf | Jul 21, 2021 | ||
Attachment 4 - Construction Cost Estimate Breakdown.xls | XLS | Jul 21, 2021 | |
Attachment 3 - Contract Insurance Compliance Notification.pdf | Jul 21, 2021 | ||
Attachment 2 - Contract Progress Schedule (AF 3064).xls | XLS | Jul 21, 2021 | |
Attachment 19 - Section M Evaluation Factors for Award_Rev 01July2021.pdf | Jul 21, 2021 | ||
Attachment 11 - SF1413.pdf | Jul 21, 2021 | ||
Attachment 14 - Solicitation Exceptions.docx | DOCX | Jul 21, 2021 | |
Attachment 13 - DB Experience Project Reference.pdf | Jul 21, 2021 | ||
Attachment 8 - Progress Payment Request.xlsx | XLSX | Jul 21, 2021 | |
Attachment 1 - SOW dated 20Aug2020_Revised MACC Specifications 6Jun2021.pdf | Jul 21, 2021 | ||
Attachment 18 - Section L Instructions to Offerors _Rev 01July2021.pdf | Jul 21, 2021 | ||
Attachment 17 - Teaming Experience Matrix.docx | DOCX | Jul 21, 2021 | |
Attachment 15 - Quality and Satisfaction Survey.pdf | Jul 21, 2021 | ||
Attachment 12 - Proposal Completeness Checklist - 17MAY2021.docx | DOCX | Jul 21, 2021 | |
FA301621R0017.pdf | Jul 21, 2021 | ||
Attachment 16 - Past Performance Information Sheet.pdf | Jul 21, 2021 | ||
Attachment 10 - Base Access Request Form.pdf | Jul 21, 2021 | ||
Attachment 9 - Warranty Call Worksheet.pdf | Jul 21, 2021 | ||
Attachment 7 - Material Approval (AF3000).pdf | Jul 21, 2021 |
Joint Base San Antonio Multiple Award Construction Contract (MACC) IDIQ
Contact and place of performance
Zandra Hearn
JBSA Lackland, TX 78236
USA
23 August 2021 Amendment 0001 Attachment 17 which is part of Amendment 0001 was in avertedly left out from the files included with the Amendment, and is hereby uploaded. *********************************************************************************************************************************************** 20 August 2021 Amendment 0001 The purpose of this amendment is to incorporate the following into the solic...
View moreThe Department of the Air Force, specifically the 502nd Contracting Squadron, is soliciting proposals for the Joint Base San Antonio Multiple Award Construction Contract (MACC) Indefinite Delivery/Indefinite Quantity (IDIQ). This procurement, identified as solicitation FA301621R0017, is a Total Small Business set-aside (SBA) categorized under NAICS code 236220 for Commercial and Institutional Building Construction and PSC Z1JZ for Maintenance of Miscellaneous Buildings. The government intends to award approximately 12 contracts to support various construction requirements, including maintenance, sustainment, repair, and alteration of real property, road paving, and design-build projects.
The program has a total ceiling value of $990 million over a ten-year lifecycle. Performance is centered at JBSA Lackland, Texas, but the resulting contracts will also support decentralized task orders at Laughlin Air Force Base and Goodfellow Air Force Base. Construction Wage Requirements will be enforced at the task order level. Amendment 0001 extended the proposal response deadline to September 13, 2021, and modified the ordering guide to remove RSMeans requirements.
Administrative materials for this solicitation include 30 attachments, such as the Statement of Work, Teaming Experience Matrix, Quality and Satisfaction Survey, and revised evaluation factors. Technical inquiries and proposal submissions are managed by Zandra Hearn. The solicitation files also include formal responses to industry questions and a conformed solicitation reflecting updated Section L and Section M instructions.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.