Name | Type | Posted | Actions |
|---|---|---|---|
TAB K- HVAC Chiller System Justification and Approval 7 Aug 19.pdf | May 6, 2020 | ||
TAB N - Foundation Plan B1003 B1005 and B1007 As Builts.pdf | May 6, 2020 | ||
Solicitation Amendment FA462020R00020009 SF 30.pdf | May 6, 2020 | ||
Attch 1.3 SOW 5 May 2020.pdf | May 6, 2020 | ||
TAB M - B1003 and B1019 Tail Door Drawings.pdf | May 6, 2020 | ||
TAB L - B1007 Prelim Hydraulic Analysis.pdf | May 6, 2020 | ||
Solicitation Amendment FA462020R00020008 SF 30 (1).pdf | May 5, 2020 | ||
TAB H-B1007 Comm Connection-1.PNG | PNG | May 1, 2020 | |
Attch 1.3 SOW dated 1 May 2020.pdf | May 1, 2020 | ||
Solicitation Amendment FA462020R00020007 SF 30.pdf | May 1, 2020 | ||
TAB I-PICTURES_B1007_RM.pdf | May 1, 2020 | ||
Solicitation Amendment FA462020R00020006 SF 30.pdf | Apr 29, 2020 | ||
SOW 27 April 2020.pdf | Apr 28, 2020 | ||
Solicitation Amendment FA462020R00020005 SF 30.pdf | Apr 28, 2020 | ||
Solicitation Amendment FA462020R00020004 SF 30.pdf | Apr 23, 2020 | ||
Attch 1.3 SOW dated 22 April 2020.pdf | Apr 23, 2020 | ||
TAB G B1001 B1003 B1005 and B1007 As Built Drawings.pdf | Apr 17, 2020 | ||
Attch 1.3 SOW 17 April 2020.pdf | Apr 17, 2020 | ||
Solicitation Amendment FA462020R00020003 SF 30.pdf | Apr 17, 2020 | ||
Attachment 1 MACC Seed Project FOPR Letter as of 17 April 2020.pdf | Apr 17, 2020 | ||
Solicitation Amendment FA462020R00020002 SF 30 (1).pdf | Apr 14, 2020 | ||
Attachment 12 2020 MACC Virtual Preproposal Site VisitConference - FA462020R0002.pdf | Apr 4, 2020 | ||
Solicitation Amendment FA462020R00020001 SF 30.pdf | Apr 4, 2020 | ||
Attachment 10C WD WA20200001 - Highway - Statewide.pdf | Mar 26, 2020 | ||
Attachment 10B WD WA20200076 Heavy Spokane County.pdf | Mar 26, 2020 | ||
Attachment 10A WD WA202000017 Building - Spokane County.pdf | Mar 26, 2020 | ||
Attachment 9 FAFB Operational Climactic Data.pdf | Mar 26, 2020 | ||
Attachment 7 Fairchild AFB 2018 Base Design Standards.PDF | Mar 26, 2020 | ||
Attachment 6 MACC Specifications 7 January 2020.pdf | Mar 26, 2020 | ||
Attachment 8 - Fairchild AFB IFS 2019.pdf | Mar 26, 2020 | ||
Attachment 5 MACC Orientation Seminar Task Order 0001 SOW dated 16 January 2020.pdf | Mar 26, 2020 | ||
Attachment 4 Subcontractor - Teaming Arrangement Release.pdf | Mar 26, 2020 | ||
Solicitation FA462020R0002 pdf.pdf | Mar 26, 2020 | ||
TAB B - Type A Pad Mount Oil-Insulated Switchgear Reference.pdf | Mar 26, 2020 | ||
TAB C - Base Switchgear Map.pdf | Mar 26, 2020 | ||
TAB D - Corrosion Control_Fuel Cell Mx Hangar Facility Standard Designs.pdf | Mar 26, 2020 | ||
TAB E - Hazardous Materials Inspection Report.pdf | Mar 26, 2020 | ||
TAB F - Standard Restroom Fixtures Cut Specification Reference.pdf | Mar 26, 2020 | ||
Attachment 3 Past Perf cover letter and Questionnaire.pdf | Mar 26, 2020 | ||
Attachment 2 Past Performance Information.pdf | Mar 26, 2020 | ||
TAB A5 - As-Built Drawing Submittal.pdf | Mar 26, 2020 | ||
TAB A4 - Utility Plan.pdf | Mar 26, 2020 | ||
TAB A3 - Elevation Model.pdf | Mar 26, 2020 | ||
TAB A2 - Site Plan Map.pdf | Mar 26, 2020 | ||
TAB A1 - Course of Action Option 3A Floor Plan.pdf | Mar 26, 2020 | ||
Tab A - Planning Charette Report.pdf | Mar 26, 2020 | ||
Attch 1.3 SOW.pdf | Mar 26, 2020 | ||
Attch 1.2 Price Schedule.pdf | Mar 26, 2020 | ||
Attachment 1 MACC Seed Project FOPR Letter.pdf | Mar 26, 2020 | ||
Attachment 11 - Task Order Procedures.pdf | Mar 26, 2020 |
Amendment 0009
2020 Multiple Award Construction Contract at Fairchild AFB
Contact and place of performance
Heather Rogers
Fairchild AFB, WA 99011
USA
This is a solicitation for a Multiple Award Construction Contract (MACC) at Fairchild AFB WA. This acquisition will provide indefinite delivery-indefinite quantity (IDIQ) and design-build (D-B) construction efforts at Fairchild AFB, Washington. The MACC will consist of multiple disciplines in general construction categories and execute a broad range of maintenance, repair, minor and/or new construction. The contracto...
View moreThe Department of the Air Force, specifically the 92 CONS LGC, is soliciting proposals for a Multiple Award Construction Contract (MACC) to support Fairchild Air Force Base, Washington, and its associated off-base sites. This indefinite delivery-indefinite quantity (IDIQ) and design-build acquisition involves general construction, maintenance, repair, and minor new construction across multiple disciplines. Tasks include facility upgrades, utility work, airfield pavement, roads, roofing, carpentry, asbestos abatement, mechanical, electrical, and plumbing services. Contractors are responsible for providing all materials, equipment, labor, and general conditions necessary to execute projects ranging from $500 to $10,000,000, though most task orders are expected to fall between $1,000,000 and $5,000,000.
This solicitation, identified by number FA462020R0002, is designated as an SBA Total Small Business Set-Aside. Eligibility is restricted to vendors with a registered Data Universal Numbering System (DUNS) in Washington, Oregon, or Idaho who possess single bonding of $10 million and aggregate bonding of $20 million. The procurement is classified under NAICS code 236220 for Commercial and Institutional Building Construction and PSC code Z2JZ for Repair or Alteration of Miscellaneous Buildings. The government intends to award approximately six contracts with a total program value not to exceed $95,000,000.
The period of performance consists of a 12-month basic period and four 12-month option periods, totaling five years. The response deadline for this solicitation was May 18, 2020, following the issuance of Amendment 0009. Documentation for this opportunity includes 50 attachments, such as various Statements of Work, HVAC chiller system justifications, foundation plans, tail door drawings, and hydraulic analyses. Heather Rogers serves as the primary point of contact for this requirement at Fairchild AFB.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.