Contact and place of performance
Scott E. Hendrix
Genoa, WI 54632
USA
The U.S. Army Corps of Engineers (USACE), St. Paul District has a requirement for a contractor to deliver mixed concrete to the Minnesota-side of the spillway located at Lock and Dam 8 in Genoa, WI. These deliveries will take place during the winter months (November 1 – March 1) over a two-year period and will require backing across the 20’ wide Reno spillway. Minimum quantity will be 350 cubi...
View moreThere is no “Plan Holder List” for this project. The interested vendors list is listed as part of the solicitation posting on the Contract Opportunities website. In order to view this list, vendors will need to sign into their SAM account.
In order for contractors to conduct business with the Department of Defense, the contractor must provide registration information to the System for Award Management (SAM). All Offerors must be registered in SAM prior to receiving an award, have an active SAM account, and have the Representations and Certifications (FAR and DFARS) sections completed prior to award. Registration instructions may be obtained, and online registration may be accomplished, at https://sam.gov/content/entity-landing.
As required by 15 U.S.C. 644(w), the Corps of Engineers’ policy and procedures, as well as past performance information, in regard to definitization of requests for equitable adjustments is found at https://www.usace.army.mil/Business-With-Us/Partnering.
The U.S. Army Corps of Engineers, St. Paul District, is soliciting quotes for the delivery of mixed concrete to the Minnesota-side spillway at Lock and Dam 8 in Genoa, Wisconsin. This requirement, issued under solicitation number W912ES25QA084, is a total small business set-aside (SBA) classified under NAICS code 327320 for Ready-Mix Concrete Manufacturing and PSC code 5610 for Mineral Construction Materials, Bulk. The government intends to award a firm-fixed-price indefinite delivery, indefinite quantity contract to support these spillway operations.
The scope of work involves delivering a minimum of 350 cubic yards of concrete, with a potential maximum of 450 cubic yards, in batches of approximately 30 yards. Performance will take place during the winter months, specifically between November 1 and March 1, over a two-year period. Delivery logistics require vehicles to back across the 20-foot wide Reno spillway to reach the designated work site.
All offers must be submitted by the response deadline of October 20, 2025. Scott E. Hendrix is the designated point of contact for this procurement. The solicitation includes two attachments: a statement of work and the primary solicitation document. All contractors must maintain an active registration in the System for Award Management to be eligible for award.
Generated by Lumen AI
Scoped analysis and attachments—go beyond the summary when you need detail from the solicitation package.